Similar Projects
Last Updated | 07/20/2022 05:44 PM |
Project Title | Roof Repair for Road Prison AC Filter/Storage Shed |
Physical Address | View project details and contacts |
City, State (County) | Cantonment, FL 32533 (Escambia County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results, |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes the shingle roof repair for the Road Prison AC Filter Storage Shed. The work includes but is not limited to: 1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept in a watertight/temperature safe environment prior to installation as per all manufacturers’ recommendations that apply. 2. Remove the 350 SF of existing asphaltic 3-tab shingles and underlayment components down to the lumber decking. 80 LF of edge metal components should also be removed and properly disposed of. Remove and dispose of 25 LF of existing ridge cap. 3. Once the existing roof system has been removed the lumber decking should be assessed for adverse moisture damages. Any damaged lumber should be removed and replaced with like kind and quality components. In addition to the lump sum bid, the contractor should include a unit price for lumber to accommodate for unforeseen deck conditions. 4. New synthetic underlayment (350 SF) should then be installed atop the lumber deck per manufacturer recommendations. Ensure the underlayment is positively lapped to prevent water bucking. 5. Install new aluminum edge metal (80 LF) along all rake lines and eaves. The underlayment should transition atop the edge metal at the eave or be stripped in with self-adhered membrane or roofing cement. 6. Install 350 SF of new architectural laminate shingles (aesthetics to be approved by owner) per manufacturer recommendations. Ensure fastener attachment patterns are adequate for uplift requirements (6 fasteners recommended). |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |