Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

Well Rehabilitation 2022 - Wells 16 and 18 Project
Infrastructure
Bidding
$72,500 CJ est. value
S Zanesville, OH 43701

Township Road Resurfacing
Post-Bid
Nashport, OH

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Wilhelm Road Realignment - Salt Creek Township
Results
$128,176 est. value
Chandlersville, OH

Major Reconstruction - MUS-IR 70-10.49
Results
OH

Construction of Structures and Facilities
Term Contract, Renovation, Infrastructure - 15,500 SF
Design
$10,000,000 CJ est. value
S Zanesville, OH 43701

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Resurfacing Various Roads 2021
Results
Zanesville, OH

Geologic Maintenance / Slide Repair - SR 146
Infrastructure
Design
$880,000 CJ est. value
S Zanesville, OH 43701

Asphalt Paving of Stone Creek Circle
Infrastructure
Post-Bid
Zanesville, OH

2021 Asphalt Paving
Results
Less than $334,364 est. value
White Cottage, OH

Asphalt Paving of Various Streets
Infrastructure
Post-Bid
Zanesville, OH

2021 Asphalt Paving Bid No 2
Infrastructure
Results
Less than $135,873 est. value
White Cottage, OH

Last Updated 09/26/2022 08:44 AM
Project Title

Slide Repair - IR 70

Physical Address View project details and contacts
City, State (County) S Zanesville, OH 43701   (Muskingum County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $642,215 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Re-establishing the stabilization of failed embankment area on North foreslope. Maintenance OPID assigned is 2442 (for Lo-dril plug shaft wall) OHDOT - Slide Repair - IR 70

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents