Similar Projects
Silverleaf Development Master Plan
New Construction
Conception
Winter Garden, FL 34787

Industrial Warehouse Development
New Construction - 61,562 SF
Conception
Ocoee, FL 34761

Airport Commerce Center
New Construction - 656,000 SF
Design
$10,000,000 CJ est. value
Orlando, FL 32824

Surelock Self Storage
New Construction - 321,388 SF
Design
Orlando, FL 32828

Parks Dr. Phillips/Orange County Public Schools (OCPS) Future Middle School Joint Ballfield Park
Renovation
Bidding
$8,000,000 est. value
Orlando, FL 32836

OUC St Cloud Operations and Maintenance Facility
New Construction - 300,000 SF
Post-Bid
Orlando, FL 32800

Judge Business Center
New Construction - 79,400 SF
Post-Bid
Orlando, FL 32182

South Water Reclamation Facility North Plant Effluent Pump Station Pre-Engineered Electrical Building
New Construction
Results
Less than $3,200,000 est. value
Orlando, FL 32819

South Water Reclamation Facility North Plant Effluent Pump Station Pre-Engineered Building
New Construction
Results
$2,111,384 est. value
Orlando, FL 32819

Crews Commerce Center Industrial Park - Phase II
New Construction - 1,290,240 SF
Construction
$27,900,000 est. value
Orlando, FL 32824

Ocoee Business Park - Buildings 100, 200, 300
New Construction - 652,686 SF
Construction
$10,000,000 CJ est. value
Ocoee, FL 34761

BlueScope Spec Warehouse
New Construction - 246,000 SF
Design
$16,000,000 est. value
Apopka, FL

Semoran Grant Storage
New Construction - 91,950 SF
Post-Bid
Orlando, FL 32822

Orange County Fire Station - 54 Metal Storage Building Replacement
Renovation
Results
$192,000 est. value
Orlando, FL 32821

Flamingo Crossings West Parcel
New Construction
Construction
$1,000,000 to $5,000,000 CJ est. value
Winter Garden, FL 34787

Last Updated 01/17/2022 02:45 PM
Project Title

Tomyn Ocoee Self-Storage

Physical Address View project details and contacts
City, State (County) Ocoee, FL   (Orange County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Seeking Zoning Variances
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Climate-controlled units

Details

Warehouse/Storage, 3 Stories Above Grade, 34,969 SF New Construction, 727 Unit(s), New Construction, 40 Parking Spaces, 8.13 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents