Similar Projects
Dike & Revetment - USACE St. Louis District
Design
$15,000,000 est. value
Cairo, IL

Locks 27 Miter Gate Anchorages Replacement
Renovation, Alteration
Design
$1,000,000 to $5,000,000 est. value
Granite City, IL 62040

Culvert Materials
Infrastructure
Bidding
IL

Mel Price Lift Gate Replacement
Post-Bid
Alton, IL

Mel Price Main Lock Overlook Alterations
Renovation
Post-Bid
Alton, IL 62002

Crab Orchard NWR Devils Kitchen Dam Aux Splway
Results
$500,000 to $1,000,000 est. value
Marion, IL

Waukegan Harbor Breakwater Repairs, Waukegan, Lake County, Illinois
Results
$1,000,000 to $5,000,000 est. value
Waukegan, IL

Illinois River Basin Dresden Island Lock and Dam;
Renovation
Design
$10,000,000 est. value
IL

MPLD Main Lock Overlook Alterations
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
East Alton, IL

Peoria and LaGrange Dams Composite Wicket Gates
Results
Peoria, IL

Replacement of Tainter Gate Brakes and Side Seal Heaters Carlyle Lake
Renovation
Post-Bid
$100,000 to $250,000 est. value
Carlyle, IL

Crab Orchard Dam Spillway Concrete Repairs
Results
$1,000,000 to $5,000,000 est. value
IL

Olmsted Floating Mooring Bitt Extensions
Renovation
Post-Bid
Olmsted, IL

Touhy Dam Removal
Results
Park Ridge, IL 60068

Culvert Slide Valves for Dresden Lock and Strut Arms
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Channahon, Joliet, Marseilles, Oglesby, IL 61348

Last Updated 05/05/2022 05:22 PM
Project Title

Cougar Lake Dam Repairs

Physical Address View project details and contacts
City, State (County) Edwardsville, IL   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Goal: DVBE(3%)

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents