Jones Ferry Wastewater Pump Station Improvements Phase 2 - General Bids
New Construction
Bidding
Less than $4,100,000 est. value
Chicopee, MA 01021

2021 Pump Station Improvements - General Bid
Bidding
$735,000 est. value
Hyannis, MA

2021 Pump Station Improvements - Sub Bid
Sub-Bidding
$735,000 est. value
Hyannis, MA

Pump Station No. 1 Rehabilitation Project - Filed Sub-Bids
Sub-Bidding
$1,150,000 est. value
Dudley, MA 01571

Amherst-Pelham Regional Middle School Pump Room
Renovation
Post-Bid
Amherst, MA 01002

Construct New West Peabody Pump Station - Sub Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Hillside Pump Station Upgrades - General Bid
Results
Less than $450,000 est. value
Milton, MA 02186

Endicott Street Wastewater Ejector Pumping Station Replacement Project
Results
Less than $1,500,000 est. value
Danvers, MA 01923

Downtown Area Collection System and Pumping Stations
Construction
$13,000,000 est. value
Orleans, MA 02653

Pump Station No 1 Rehabilitation Project - General Bids
Bidding
$1,150,000 est. value
Dudley, MA 01571

Construct New West Peabody Pump Station - General Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Beverly Pump Station Bar Rack Replacement - General Bid
Results
Less than $1,300,000 est. value
Salem, MA

Wastewater Pump Station Maintenance and Repairs
Post-Bid
Less than $150,000 est. value
Lexington, MA

Folly Hill Chlorine Booster - General Bid
Results
Less than $340,000 est. value
Danvers, MA 01923

Carbon Replacement at Delauri Pump Station
Post-Bid
Boston, MA 02129

Last Updated 04/01/2021 04:04 PM
Project Title

Well Pumping Station 1 Rehabilitation, Treatment Building 3 and Appurtenant Work - General Bids

Physical Address View project details and contacts
City, State (County) Barnstable, MA 02630   (Barnstable County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,350,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. Generally consists of 1) installation of chemical feed equipment, chemical storage equipment, and associated components in a new prefabricated building; 2) rehabilitation of the existing pumping station including architectural, structural, electrical, painting and mechanical modifications; and 3) installation of an outside generator with automatic transfer switch within the facility, and associated gas piping and electrical work.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Site Remediation.
Division 03 - Concrete.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 11 - Equipment.
Division 13 - Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents