Similar Projects
Materials Recovery Facility Single Stream System Design
Infrastructure
Bidding
Chittenden, VT

Farm Road Pipe Arch
Infrastructure
Bidding
West Windsor, VT

Garvin Hill Road and Grout Road Project
Infrastructure
Post-Bid
$25,000 est. value
Hartland, VT

Chester TAP TA17(9)
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value
Chester, VT

North Troy LPOE Site Civil Repairs
Results
North Troy, VT 05859

Chestnut Hill Road Stormwater Mitigation
Results
Montpelier, VT

Hardwick STP 037-3(7)
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Hardwick, VT

Town Line Road Culvert Replacement
Infrastructure
Post-Bid
Mendon, VT 05701

Burlington STP 2035 (15) C/1
Results
$250,000 to $500,000 est. value
Burlington, VT 05401

Chester STP Culv(60)
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Chester, VT

ANR FWL Front Line Rearing Ponds Improvements
Infrastructure
Post-Bid
Bennington, VT 05201

HVAC Vault and Parking Drainage Upgrade
Results
Waterbury, VT 05676

Construction for Ditching and Culvert Replacements
Infrastructure
Bidding
Strafford, VT

Davis Road Box Culvert
Infrastructure
Post-Bid
Royalton, VT 05063

Elm Street Outfall Stabilization
Results
$15,000 to $30,000 est. value
Winooski, VT

Reported 02/09/2022 12:00 AM
Project Title

Lyman Drive / Sucker Brook Culvert Replacement

Physical Address View project details and contacts
City, State (County) Williston, VT 05495   (Chittenden County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The replacement of existing dual corrugated metal pipe arches and installation of an aluminum structural plat pipe arch, including the reconstruction of a segment of Lyman Drive with guard rail, utility conduits, stone fill, and associated EPSC measures.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents