Similar Projects
Pearl Place
New Construction, Infrastructure - 43,000 SF
Conception
$3,100,000 CJ est. value
Santa Rosa Beach, FL 32459

Pearl Place
New Construction, Infrastructure - 43,000 SF
Conception
$3,100,000 CJ est. value
Santa Rosa Beach, FL 32459

Bishop Landing
New Construction, Infrastructure
Design
$79,800,000 CJ est. value
Santa Rosa Beach, FL 32459

Bishop Landing
New Construction, Infrastructure
Design
$79,800,000 CJ est. value
Santa Rosa Beach, FL 32459

Water, Sewer And Roadway At Woodlawn Commerce Park
Infrastructure
Post-Bid
Defuniak Springs, FL

South Jackson Street SCOP Improvements
Infrastructure
Post-Bid
Freeport, FL 32439

Milling and Resurfacing of SR 30 (Us 98) From East of Village Road (Mp 4.526) To East of SR 83 (Us 331) (Mp 13.203) In Walton County. Mp 5.531 To Mp 7.606
Infrastructure
Results
FL

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Stow Away Storage Expansion
New Construction, Infrastructure - 96,800 SF
Construction
$10,500,000 CJ est. value
Freeport, FL 32439

TownePlace Suites / Miramar Beach
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Miramar Beach, FL 32550

TownePlace Suites / Miramar Beach
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Miramar Beach, FL 32550

Retreat at the Bay
New Construction, Infrastructure - 17,600 SF
Conception
$51,400,000 CJ est. value
Santa Rosa Beach, FL 32459

South Walton Fire District - Logistics Building 3rd Floor Buildout
Build-Out - 3,500 SF
Design
Santa Rosa Beach, FL 32459

Hewett Bayou Connector Road - Walton County
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Defuniak Springs, FL 32435

Last Updated 05/03/2023 04:12 PM
Project Title

331 Commerce Park

Physical Address View project details and contacts
City, State (County) Defuniak Springs, FL 32433   (Walton County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Paving/Reconstruction, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the new construction of a 57,600-square-foot storage facility and four 1 story, 20,000-square-foot warehouses. As of May 3, 2023 the project is in planning stage. Walton County has approved a land clearing permit, rezoning and a development agreement. Information regarding the architect, general contractor and method of selection has not been disclosed. A construction timeline has not been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 137,600 SF - 4 Stories Above Grade, 57,600 SF. 1 Story Above Grade, 80,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Fire Protection Specialties, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents