Similar Projects
Last Updated | 07/30/2019 10:16 AM |
Project Title | Dogwood Lane Drainage Improvements Phase II |
Physical Address | View project details and contacts |
City, State (County) | Emerson, NJ (Bergen County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Dogwood Lane Replacement of existing reinforced concrete pipe, concrete curb, and the construction of a new manhole. Pine Drive Milling and resurfacing of Pine Drive from Eagle Drive to Main Street. Eagle Drive Replacement of an existing B-Inlet and associated pipe and curb. Pavement adjacent to the inlet shall be restructured to the correct elevation. Principal items of work in the project include: 4,100 S.Y. HMA Milling, 3" or Less 600 TON Hot Mix Asphalt 12.5M64 Surface Course 110 L.F. 21" Reinforced Concrete Pipe The work contemplated under this Contract shall be completed by June 7, 2019. | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |