Similar Projects
PRESOLICITATION NOTE - Design-Bid-Build (Dbb), Dry Dock 2, Portal Crane Rail And Tunnel Repairs located at Portsmouth Naval Shipyard in Kittery, ME.
Design
$10,000,000 est. value
Kittery, ME 03854

Main Floats Reconstruction
Bidding
Bucksport, ME 04416

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Post-Bid
$500,000,000 est. value
Kittery, ME

Isles of Shoals Harbor of Refuge, NH & ME
Post-Bid
$5,000,000 to $10,000,000 est. value
Concord, MA - Cape Elizabeth, ME - Rye, NH

Y--P-310 Dry Dock 1 Super Flood Basin and P-1074 Extend Portal Crane at Portsmouth Naval Shipyard in Kittery, ME
Results
$100,000,000 to $250,000,000 est. value
Kittery, ME

Waterfront Repairs, U.S. Coast Guard Station Southwest Harbor, Me (Hancock County)
Results
$1,000,000 to $3,000,000 est. value
Southwest Harbor, ME 04679

Shipyard Services
Post-Bid
Portland, ME

Selective Pier Deck Replacement
Results
Lincolnville, ME

14’ X 30’ Heavy Duty Float
Results
Lincolnville, ME

Wharf Reconstruction Improvements
Results
Tremont, ME 04653

DMC Pier Replacement
Results
Walpole, ME 04573

Development and Installation of New Floats
Results
Belfast, ME

DD2 Portal Crane and Tunnel Repairs
Results
Kittery, ME

Androscoggin River Boat Launch Improvements
Results
Rumford, ME

Mitchell Field Town Landing
Results
Less than $284,000 est. value
Harpswell, ME 04079

Last Updated 08/27/2020 12:34 PM
Project Title

Cook's Point Boat Ramp Improvement Project

Physical Address View project details and contacts
City, State (County) Old Town, ME 04468   (Penobscot County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a boat ramp improvement project on Pushaw Lake. The project includes the installation of new base material, precast concrete boat ramp sections, and riprap at an existing boat ramp located off Woodland Avenue, on Pushaw Lake.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents