Last Updated | 10/13/2023 06:03 AM |
Project Title | 480 VAC Switchgear replacement - Soldier Canyon Pump Station |
Physical Address | View project details and contacts |
City, State (County) | Fort Collins, CO 80521 (Larimer County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $450,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000329317 Platte River seeks a contractor to design, manufacture, remove and install a 480 VAC switchgear located at its Soldier Canyon Pump Station. The removal of the old switchgear and installation of the new switchgear will need to be performed by the contractor or subcontracted out. Platte River will arrange an outage for the pre-bid meeting to take place so contractors can take the necessary measurements to design and manufacture the new 480 VAC switchgear. Once the contract has been awarded, another outage will be scheduled for the contractor to review its design. The delivery of the new 480 VAC switchgear to the Soldier Canyon Pump Station site would ideally be no later than November 6, 2023. A final outage will be scheduled for the removal and installation of the 480 VAC switchgear and the Work would ideally be complete and in service by December 31, 2023. If this schedule is not a realistic timeframe for vendors, Platte River will accept the review of proposed alternate delivery date and Work completion dates provided with proposals. Question Acceptance Deadline 09/27/2023 at 3:00 PM MT Questions are submitted online Yes the project scope and answer questions relating to the project. If attending, please send an email to ContractAdmin@prpa.org Answers emailed to bidders on or about: Wednesday, October 4, 2023 General Requirements - Bid Deposit Required - FOB Destination - Insurance Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % *Platte River reserves the right to reject any or all bids. Bid proposals may not be altered, withdrawn, or resubmitted for 90 days after the bid submission deadline. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |