Similar Projects
Foothills Electrical Underground Rampart Road
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
Fort Collins, CO 80521

School Flashers
Term Contract
Sub-Bidding
Fort Collins, CO 80521

Estes Park Campground at Mary's Lake Water and Electrical Distribution System Improvements Phase 2
Post-Bid
$500,000 est. value
Estes Park, CO 80517

Emergency Power Projects
Renovation
Post-Bid
$800,000 CJ est. value
Fort Collins, CO 80521

District Generator Services
Term Contract, Alteration
Results
Fort Collins, CO

FY 23 Signal Pole Replacement
Infrastructure
Results
$2,118,114 CJ est. value
Fort Morgan, CO 80701

Lightning Protection for Water Treatment and Water Reclamation Facilities
Alteration
Post-Bid
$130,000 est. value
Wellington, CO

Lincoln Center Theatre Lighting Replacement
Alteration
Results
$700,000 est. value
Fort Collins, CO 80521

Cable, U.G. 600V, AL, Compressed, Triplex
Alteration
Post-Bid
Fort Collins, CO 80521

Pulse Locate Retrofits
Renovation
Results
$1,274,614 CJ est. value
Loveland, CO 80537

3 Phase Switching Cabinet and Base
Alteration
Post-Bid
Fort Collins, CO 80521

Boxpad
Alteration
Post-Bid
Fort Collins, CO 80521

2" Flexible Conduit
Alteration
Post-Bid
Fort Collins, CO 80521

Electrical Services Contractor for Water and Wastewater Treatment Facilities
Term Contract
Post-Bid
Fort Collins, CO 80525

75kVA Pad-Mounted Compartmental Transformer
Term Contract
Post-Bid
Fort Collins, CO 80521

Last Updated 10/13/2023 06:03 AM
Project Title

480 VAC Switchgear replacement - Soldier Canyon Pump Station

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80521   (Larimer County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000329317 Platte River seeks a contractor to design, manufacture, remove and install a 480 VAC switchgear located at its Soldier Canyon Pump Station. The removal of the old switchgear and installation of the new switchgear will need to be performed by the contractor or subcontracted out. Platte River will arrange an outage for the pre-bid meeting to take place so contractors can take the necessary measurements to design and manufacture the new 480 VAC switchgear. Once the contract has been awarded, another outage will be scheduled for the contractor to review its design. The delivery of the new 480 VAC switchgear to the Soldier Canyon Pump Station site would ideally be no later than November 6, 2023. A final outage will be scheduled for the removal and installation of the 480 VAC switchgear and the Work would ideally be complete and in service by December 31, 2023. If this schedule is not a realistic timeframe for vendors, Platte River will accept the review of proposed alternate delivery date and Work completion dates provided with proposals. Question Acceptance Deadline 09/27/2023 at 3:00 PM MT Questions are submitted online Yes the project scope and answer questions relating to the project. If attending, please send an email to ContractAdmin@prpa.org Answers emailed to bidders on or about: Wednesday, October 4, 2023 General Requirements - Bid Deposit Required - FOB Destination - Insurance Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % *Platte River reserves the right to reject any or all bids. Bid proposals may not be altered, withdrawn, or resubmitted for 90 days after the bid submission deadline.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents