Similar Projects
(Idiq) Multiple Award Task Order Contracts (Matoc) For Vegetation Management Services On The Daniel Boone National Forest In Kentucky
Term Contract
Design

Fine Arts Building Elevator Modernization
Renovation
Bidding
Lexington, KY 40508

Fine Arts Building Elevator Modernization
Renovation
Bidding
Lexington, KY 40508

Mowing For Environmental Services
Term Contract
Post-Bid
Lexington, KY

Cleaning Services for Flooding
Post-Bid
Lexington, KY

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Improvements at Various Intersections
Results
KY

Maintenance, Repair and Operations (MRO) Trade Services
Renovation, Alteration
Bidding
Lexington, KY

Wood Fiber Safety Surface
Post-Bid
Lexington, KY

Pavement (with Alternates)
Results
Lexington, KY

Underground Electrical Services
Term Contract
Bidding
Lexington, KY

General Mowing Services
Post-Bid
Lexington, KY

Asphalt Resurfacing
Results
KY

Solar PV Installation Fire Station 21
Alteration
Bidding
Lexington, KY 40509

Downtown Street Light Equipment
Alteration
Post-Bid
Lexington, KY

Last Updated 02/08/2022 12:46 PM
Project Title

UK CAER - Infrastructure

Physical Address View project details and contacts
City, State (County) Lexington, KY 40511   (Fayette County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Electric, Fencing, Landscaping/Irrigation, Mechanical, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $384,079
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mechanical Work Scope includes but is not limited to the following: The demolition of the existing above ground nitrogen, hydrogen, and carbon monoxide gas lines from the existing gas trailers and nitrogen storage tank to the extents identified on the drawings. The lines will be prepared for reconnection where indicated. The new work shall include back-feeding the existing gas infrastructure by providing new nitrogen, hydrogen, and carbon monoxide piping from the new gravel utility pad area, where the gas trailers are relocated to, to the existing gas lines where indicated on drawings. Electrical Work Scope includes but is not limited to the following New ductbanks for primary power and communications site distribution with connections to existing manholes. Installation of new University-owned 15 KV feeders, new primary metering risers and terminations to existing cable infrastructure. Coordination with communications service providers for installation of fiber optic and copper cables. Installation of a new ductbank and riser for Kentucky Utilities-owned primary cables. Relocation of existing site lighting and provision of new building-mounted site lighting. Site Work Scope includes but is not limited to the following: Site clearing and grading associated with utility work and installation of a new gravel utility pad with new 8' galvanized chain link security fencing and gates, restoration of disturbed turf areas via hydroseeding.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 26 - Electrical.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents