Similar Projects
Buck Highway Slurry Seal Project
Infrastructure
Bidding
$150,000 est. value
Bayfield, CO 81122

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

General Maintenance Contractor Service
Infrastructure
Post-Bid
Ignacio, CO

County Road 509 Siphon Replacement Project
Results
Durango, CO 81301

CR 210 Paving Overlay Project
Results
Durango, CO 81301

Cedar Point Road Project
Infrastructure
Post-Bid
CO

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

Application of Open-Graded, Friction Course (OGFC) to Various City Streets
Infrastructure
Post-Bid
Durango, CO

Replacing and Patching Damaged Concrete Pavement
Results
$5,000,000 to $20,000,000 est. value

County Road 141 Paving Overlay
Infrastructure
Post-Bid
CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

R5 Concrete Apron - Durango South Forty yard
Infrastructure
Post-Bid
$670,000 est. value
Durango, CO 81303

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

County Road 234 Paving Overlay
Results
Durango, CO

Eight Corners Intersection Repair
Results
Less than $92,452 est. value
Bayfield, CO

Reported 05/05/2022 02:46 PM
Project Title

Reconstruction of City Alleys at Various Locations

Physical Address View project details and contacts
City, State (County) Durango, CO   (La Plata County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Generally, the work under this contract includes furnishing all labor, materials, and equipment necessary for reconstructing approximately 2,200 square yards of asphalt alley surface, including the installation of approximately 550 tons of hot-mix asphalt at (2) locations in the City of Durango All work shall be done under the supervision and inspection of the City Project Manager or assigned agent. Any deviation from the standard specifications shall be approved, in writing, in advance. Any deviation from the standard specifications without prior authorization shall result in the immediate suspension of work, and possible termination of contract. The scheduled work period is tentatively (weather permitting) set for June 6 - October 28, 2022, unless otherwise agreed upon by both the City of Durango, and the Successful Contractor. Project sites and specifications for each area: A1. West 100 block between 28th St and 29th St : Remove the existing asphalt and base material to a depth of -4”. Re-grade and compact base material to establish a consistent >2% inverted slope. Repave with two - 2” lifts of hot mix asphalt mat . The south end of this project shall drain to 28th street. Project area is approximately 1, 100 SY – 275 Tons of asphalt. A2. 900 block Alley between 5th and 6th Avenue: Remove the existing asphalt and base material to a depth of -4”. Re-grade and compact base material to establish a consistent >2% inverted slope. Repave with two - 2” lifts of hot mix asphalt mat Project area is approximately 1,100 SY – 275 Tons of asphalt.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents