Similar Projects
Effluent Truck Wash Facility - SA0015 - City of Norman
Infrastructure
Conception
$492,950 CJ est. value
Norman, OK 73069

I-44 - Utilities
Infrastructure
Conception
$885,851 CJ est. value
Norman, OK 73026

Grade, Drain and Surface - IS 35
Infrastructure
Design
$10,000,000 CJ est. value
Norman, OK 73069

Utilities - US 77
Infrastructure
Design
$1,250,000 CJ est. value
Noble, OK 73068

Test Holes and New Water Supply Well (17)
Infrastructure
Bidding
$400,000 CJ est. value
Lexington, OK 73051

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Waterline Replacement - Memorial Road and Lake Hefner Parkway
Infrastructure
Results
$875,000 est. value
Oklahoma City, OK

Hinton Waterline Extension
Infrastructure
Results
$325,000 est. value
Hinton, OK

Mud Valley Road Waterline Relocations
Infrastructure
Construction
$1,465,563 CJ est. value
Tahlequah, OK 74464

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

Somerset
New Construction, Infrastructure
Pending Verification
$277,000,000 CJ est. value
Oklahoma City, OK 73099

Grade, Drain, Bridge and Surface - SH 37
Infrastructure
Conception
$20,000,000 CJ est. value
Oklahoma City, OK 73170

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

137th Backflow Repair
Term Contract
Post-Bid
Oklahoma City, OK

Last Updated 04/20/2023 06:35 AM
Project Title

REAP 2023 Waterline Replacement

Physical Address View project details and contacts
City, State (County) Hennessey, OK 73742   (Kingfisher County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $217,737 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Water Utilities, Waterlines, Utility Street Construction and Excavation, Directional Drilling, Sewer and Water Construction, Water/Wastewater Infrastructure, Traffic Control Devices (Signals, Signing, etc.), Water Infrastructure (Water Meters). Construct approximately 1,154 LF of 6" PVC C-900 DR-14 using trenching and directional drilling methods.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents