Similar Projects
Bridge 00002 Repair by Replacement
Design
$1,000,000 to $2,000,000 est. value
Fort McCoy, WI

Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Parking Lot Repairs
Infrastructure
Bidding
Kenosha, WI 53144

37th Avenue CDBG Resurfacing
Infrastructure
Bidding
Kenosha, WI 53140

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

2021 Kansas Street - Street and Utility Improvements
Post-Bid
Horicon, WI 53032

Town of Ithaca, Mcavoy Hill Road, Little Willow Creek Bridge
Results
WI

Cassville - Patch Grove, Structures
Results
Cassville, Patch Grove, WI 53806

The Couture Apartments
New Construction
Construction
Milwaukee, WI 53202

Repair Sidewalks / Install Pull-out Lane Project
Alteration
Design
$25,000 to $100,000 est. value
Tomah, WI 54660

Connors Creek ATV Trail Bridge Replacement
New Construction, Infrastructure
Bidding
$160,000 est. value
Winter, WI 54896

2021 Curb, Gutter and Sidewalk
Term Contract
Post-Bid
Reedsburg, WI

V. of Potosi, Brewery Hollow Road, Potosi Branch Bridge
Results
Potosi, WI 53820

2022 Parking Lot Maintenance
Infrastructure
Bidding
Baldwin, WI 54002

2021 Minor Street Improvements
Post-Bid
Clintonville, WI 54929

Last Updated 03/10/2022 01:27 PM
Project Title

Repair Trail and Bridge Washouts

Physical Address View project details and contacts
City, State (County) Mason, WI 54856   (Bayfield County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $925,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repairing washouts at two sites located in the Town of Delta in Bayfield County. Site 1 is located on the portion of the snowmobile trail between FH 35 and Pike River Road. Site 1 work consists of roadside clearing, clearing and grubbing, excavation common, path reconstruction, concrete masonry, permanent sheet pile, installation of a prefabricated steel truss structure, restoration, and all incidental work. Site 2 is located on White River Fisheries Road. Site 2 work consists of removing existing structures, excavation common, concrete masonry bridges, piling cast-in-place concrete, installation of an HS-20 timber bridge, channel realignment, riprap heavy, restoration, and all incidental work.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents