Similar Projects
Hugh Hartman Elementary School Mechanical Upgrade Project
Alteration
Bidding
$454,000 est. value
Redmond, OR 97756

Construct Freezer
Alteration
Bidding
$330,000 est. value
Salem, OR 97301

Cleanroom Deep Reactive Ion Etcher Plasama Dep
Alteration
Post-Bid
Eugene, OR

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Kliever Armory Boiler Replacement and HVAC Updates
Alteration
Results
$370,000 to $395,000 est. value
Portland, OR 97211

Hood River Armory Boiler Replacement
Alteration
Results
$220,000 to $260,000 est. value
Hood River, OR 97031

Oakdale Auditorium Chiller Replacement
Alteration
Bidding
$200,000 est. value
Medford, OR 97501

Annual Boiler Service
Term Contract
Post-Bid
Portland, OR 97214

HVAC - Boiler Support and Maintenance
Alteration
Results
OR

5-Site Mechanical Repairs and Controls Replacement
Alteration
Bidding
$2,600,000 est. value
Gresham, Portland, OR 97080

Boiler BEI Testing and Boiler Tuning
Term Contract
Post-Bid
Roseburg, OR 97471

UO Baker Center Roof Replacement PH2 Area F
New Construction, Demolition, Alteration
Results

On-Call and Emergency Mechanical and HVAC Services
Term Contract
Post-Bid
Less than $50,000 est. value
Redmond, OR

DMV Headquarters HVAC Upgrades
Term Contract
Results
$200,000 est. value
Salem, OR 97314

Lasells Stewart Center Mechanical and Roof Renewal
Alteration
Post-Bid
Corvallis, OR 97331

Last Updated 05/11/2022 02:11 AM
Project Title

HVAC Gas Furnaces

Physical Address View project details and contacts
City, State (County) Harrisburg, OR 97446   (Linn County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Elementary school, removal and replacement of (14) existing gas furnaces in Building 1 classrooms: 1-14. Install air purification units in these (14) classrooms. 2. Add rooftop condensing units for direct expansion cooling to the (14) Building 1 Elementary school classrooms, where the new furnaces are to be installed. Install (1) mini split cooling unit for the Elementary school, Building 1 Data/IT equipment server room. Install (2) evaporator coils and (2) rooftop condensing units for the addition of cooling to (2) existing newer Daikin gas furnaces: for Building 1 Elementary school classrooms 15 & 16 (units FE-15 & 16.) Install (2) evaporator coils and (2) rooftop condensing units for the addition of cooling to (2) existing newer Daikin gas furnaces: for Elementary school Building 1 Multi-purpose room/gym (units EF-17 & 18.) Install air purification units for the rooms that are supplied by units: FE-15 & 16 and EF-17 & 18 3. Install (6) Wall mount, cooling only, Mini Splits and (6) outdoor condensing units at Harrisburg Middle School Building 3 for classrooms 19-22.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents