Similar Projects
Siesta to Tequila Looping Waterline
Infrastructure
Bidding
$300,000 CJ est. value
Pueblo West, CO 81007

Large Main Lining Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Pueblo, CO 81006

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Emergency Water Line Repairs for City Parks
Term Contract
Post-Bid
Pueblo, CO

Pueblo Water- Supply of 24" Mjxmj Butterfly Valves
Results
$30,000 to $35,000 est. value
Pueblo, CO 81003

Pueblo Water - Annual Contract Corporation Stops 2021
Term Contract
Results
Pueblo, CO 81003

RFP D/B - Replace Site Water Supply System at South High School
Infrastructure
Post-Bid
$100,000 est. value
Pueblo, CO 81005

Pueblo Water - City Wide Main Renewals 2020 PN 215104
Term Contract
Results
CO

2021 Selenium Reduction Project
Results
Pueblo, CO

Platteville Boulevard Dry Creek Crossing
Results
Pueblo, CO 81007

Six Month Contract for PVC Water Distribution Pipe
Term Contract
Results
$100,000 to $150,000 est. value
CO

Water Main Relocation at Sunset Park Elementary School
Infrastructure
Results
Pueblo, CO 81005

Relocate Thirty Inch Water Main
Alteration
Results
Pueblo, CO 81001

Supply of 48" and 54" FLGxFLG Butterfly Valves
Infrastructure
Results
$50,000 to $60,000 est. value
Pueblo, CO

Pueblo Water - Water Meters Compound 2021
Term Contract, Infrastructure
Results
Pueblo, CO

Reported 08/04/2022 12:00 AM
Project Title

Pueblo Water - Supply of Water Meters 3/4 and 1 2022

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81003   (Pueblo County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022,
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Supply of 3/4" and 1" Water Meters. Pueblo Water reserves the right to award the contract separately for the lowest bid of each item listed in the proposal. Pueblo Water will also consider warranty, performance and maintenance history. All meter must have NSF 61 compliant casing.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents