Similar Projects
Parking and Drainage Repairs at Charles E. Beatley, Jr. Central Library
Bidding
Alexandria, VA 22304

Country Club Road Drainage Improvements - Phase III
Bidding
Newport News, VA

Design-Build for Stream Restoration Lick Run at Roanoke Regional Airport
Post-Bid
$681,937 est. value
Roanoke, VA 24011

S--Bio Retention Pond Service
Post-Bid
Hampton, VA 23667

Sandy Run Regional Park Shoreline Stabilization
Results
$25,000 est. value
Fairfax Station, VA

Border Road Drainage Improvements Phase 2B
Results
Chesapeake, VA

Kessler Mill Drainage Improvements
Post-Bid
Salem, VA

Buena Vista Industrial Park Access Road and Utilities Phase I
Results
Buena Vista, VA 24416

Mill Street Drainage Improvements
Post-Bid
Dayton, VA

Polymer Coated CM Pipe for Christiansburg AHQ
Results
Christiansburg, VA 24073

PPEA Blacks Run Restoration and Nutrient Reduction
Post-Bid
Harrisonburg, VA

Benchmark Road Slope Stabilization
Results
Fredericksburg, VA 22408

Spring 2019, Multiple Stream Restoration Projects
Post-Bid
$2,000,000 to $4,000,000 est. value
Fairfax, VA 22035

Cape Charles Harbor Fixed Breakwater - Phase 1
Results
Cape Charles, VA 23310

Drainage Improvements Fairfax Camp 30 AHQ Maintenance Facility
Post-Bid
Fairfax, VA 22030

Reported 04/07/2021 12:00 AM
Project Title

High Knob Recreation Area Improvements Project

Physical Address View project details and contacts
City, State (County) Norton, VA   (Norton City County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project intends to replenish the existing beach area located at the High Knob Recreation Area Lake. Work will include the placement of new sand to the beach area extending into the lake for a smooth transition into the water. Beach area will require new wooden timbers and ditch restoration to protect the sand in the future.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents