Similar Projects
Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

Story Mill Road Reconstruction From Bridger to Griffin and Bridger/ Story Mill Intersection Improvements Project
Infrastructure
Design
$300,000 CJ est. value
Bozeman, MT 59715

Story Mill Road Reconstruction From Bridger to Griffin and Bridger/ Story Mill Intersection Improvements Project
Infrastructure
Design
$300,000 CJ est. value
Bozeman, MT 59715

Municipal Groundwater Test Wells
Infrastructure
Bidding
$50,000 CJ est. value
Bozeman, MT 59718

2023 Downtown Sewer Renovations
Infrastructure
Bidding
$1,120,000 CJ est. value
Bozeman, MT 59715

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Chip Seal E Frontage Road SE Of Dutton Airport Great Falls Area
Infrastructure
Post-Bid
Belgrade, MT 59714

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Joint City-County Law and Justice Center - Gallatin County and City of Bozeman
New Construction, Renovation, Infrastructure
Construction
$29,000,000 CJ est. value
Bozeman, MT 59715

Bozeman Health Medical Clinic
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Bozeman, MT 59715

Timber Ridge Apartments
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Bozeman, MT 59718

Oak & 19th Intersection Improvements - SIF147 - City of Bozeman
Alteration
Conception
$750,000 est. value
Bozeman, MT 59718

Southside Lofts
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Bozeman, MT 59715

Last Updated 09/16/2022 02:01 AM
Project Title

Logan Landfill Phase 5 Landfill Expansion Earthwork

Physical Address View project details and contacts
City, State (County) Three Forks, MT 59752   (Gallatin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Excavation, Box Culvert, Drainage Description: The project consists of excavation of approximately 1,004,100 cubic yards of soil, embankment of approximately 17,900 cubic yards of soil, road surfacing, drainage improvements, and box culvert.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents