Similar Projects
Capital Improvements Phase 1 - Sequence 2.2
Renovation
Bidding
Hillside, Maywood, IL 60153

CPS Pre K Package 11
Renovation
Bidding
Chicago, IL 60621

New Innovative Center & School Renovations
Renovation
Post-Bid
Carol Stream, IL 60188

ICR Wendell Phillips Academy HS
Post-Bid
Chicago, IL 60653

Oak Park & River Forest HS South Cafeteria Phase I
Renovation
Results
Oak Park, IL 60302

Disaster Recovery Services
Results

CPS Colemon/Haley/Talman PreK
Renovation
Bidding
Chicago, IL 60628

2021 Summer Renovations at West Oak Campus and Diamond Lake School
Renovation
Post-Bid
Mundelein, IL 60060

Gym 1 Renovations and Think Lab at Lane Tech HS
Renovation
Results
Chicago, IL 60618

STEM Lab & Administrtion Center
Renovation
Bidding
Matteson, IL 60443

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

ICR - Ceiling Replacement at Roberto Clemente Community Academy High School
Results
Chicago, IL 60622

Cobden High School
Renovation
Bidding
Cobden, IL 62920

The Prairie Middle School Campus and Station Middle School Campus Projects
Post-Bid
Barrington, IL

East Building Addition Phase II Project Fitness Addition
Addition
Results
Half Day, Lincolnshire, IL 60069

Reported 02/05/2021 12:00 AM
Project Title

Summer 2021 Improvements at Palombi MS

Physical Address View project details and contacts
City, State (County) State-Wide: IL
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 01/27/21
Owner View project details and contacts
Architect View project details and contacts
Description

The school is looking to perform renovations at three (3) existing schools. This work shall include renovations to three (3) existing school buildings. This project will involve the following trade work: concrete, structural & misc. steel, masonry, carpentry, windows & doors, roofing, ceilings, exterior & interior framing, flooring, painting, fire protection, plumbing, mechanical, electrical, and audio / visual work. The architect for this project is STR Partners. Bid Packages include: BP Description BP 04A Masonry Work BP 06A General Trades Work BP 06B General Trades Work BP 07A Roofing Work BP 07B Roofing Work BP 08A Ceramic Tile Work BP 09A Painting Work BP 09B Flooring Work (soft) BP 14A ADA Lifts BP 22A Plumbing Work BP 23A Mechanical Work BP 26A Electrical Work BP 27A AV Equipment Work

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents