Similar Projects
Replacement of Approximately 12` of Broken Clay Sewer Main on Foster Street with New PVC Pipe
Bidding
$10,000 est. value
Southbridge, MA 01550

Cleaning of the Grease Traps and Rod Outlet Line and Grease Tank Pump and Disposal
Post-Bid
Less than $16,000 est. value
Worcester, MA

Sanitary Sewer Evaluation
Post-Bid
Less than $12,000 est. value
Westborough, MA

Municipal Sewer Connection
Results
Less than $31,000 est. value
Millbury, MA

Interior Sewer Line Replacement, Congregate 667-4
Results
Less than $36,000 est. value
Millbury, MA

Grease Trap Services
Post-Bid
Worcester, MA 01602

Sewer Rehab (S18-3)
Results
Less than $1,200,000 est. value
Worcester, MA

Effluent Disposal System Modification
Post-Bid
Less than $200,000 est. value
Bolton, MA 01740

Sewer Cleaning and Flushing Services
Term Contract
Results
Worcester, MA

Polyvinyl Chloride (PVC) Sewer Pipe
Post-Bid
Less than $400,000 est. value
Grafton, MA 01519

Sewer - Water Rehabilitation (S19-1) / DPW & P
Results
$2,570,000 est. value
Worcester, MA

Phase I – Route 20 Corridor Sewer Upgrades
Post-Bid
$3,600,000 est. value
Shrewsbury, MA

Interceptor Rehabilitation
Results
Less than $1,800,000 est. value
Westborough, MA

Sewer System Evaluation Survey 2020
Post-Bid
Clinton, MA

Sewer Replacement, Calumet Court 667-1
Results
$132,000 est. value
Uxbridge, MA

Reported 02/13/2019 12:00 AM
Project Title

Northborough - Rehabilitation Project - Year 1

Physical Address View project details and contacts
City, State (County) Northborough, MA   (Worcester County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $307,500
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description Sewer Rehabilitation Project – Year 1. The scope of work includes: Clean, inspect, test and seal 4,832 lf of sewers; install 285 lf of structural CIPP; install 29 lf of structural CIP short liner; install drop connection in 1 sewer manhole; cementitious lining of 36 sewer manholes; replace 1 wye connection; open cut point repair of 6 feet of sewer; invert sealing in 4 sewer manholes, remove and replace 174 lf of 8-inch PVC sewer; remove and reinstall 1 sewer manhole; rebuild 1 sewer manhole bench and invert.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents