Similar Projects
Intersection Improvement
Bidding
$1,256,298 est. value
FL

Intersection Improvement
Bidding
$6,226,496 est. value
FL

Broward Road Roadway Improvements
Post-Bid
Less than $315,377 est. value
Jacksonville, FL 32099

Parramore Road Extension
Post-Bid
Jacksonville, FL

Deerwood Park Blvd Roadway and Bridge Improvements
Results
Less than $2,670,060 est. value
Jacksonville, FL 32099

Rogero Road Roundabout Improvements
Results
Less than $1,285,624 est. value
Jacksonville, FL 32099

Resurfacing
Bidding
$3,363,640 est. value
FL

I-10 Rest Area Reconstruction
Results

Eastport Road Force Main Extension
Bidding
Jacksonville, FL 32214

Asphalt Repair at Jacksonville Maintenance Yard
Results
Jacksonville, FL 32205

Trapac Asphalt Improvements Dames Point Marine Terminal
Results
Jacksonville, FL 32206

University/Merrill Roundabout Construction
Results
Jacksonville, FL 32203

5th and McDuff Roadway Improvements
Results
Less than $2,487,697 est. value
Jacksonville, FL 32203

Resurfacing
Results
Less than $3,976,060 est. value
FL

Fire Station 01 Concrete Pavement Repair
Results
Jacksonville, FL 32202

Last Updated 05/26/2020 10:57 AM
Project Title

San Pablo Right Turn Lane Phase 2 Project

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32202   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $63,719
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of furnishing all labor, materials, and equipment and performing all operations necessary for the reconstruction of a through lane and changed to a right turn lane for the southbound direction on San Pablo Road at W.M.Davis Parkway intersection. This work is considered PHASE 2. The work includes raised concrete island removal, removal of existing striping, removal of existing pavement, and a new concrete island, added pavement repair, ADA accessible ramps, new pavement and lane striping, and signage in accordance with the Contract Drawings and Specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents