Similar Projects
Last Updated | 05/26/2020 10:57 AM |
Project Title | San Pablo Right Turn Lane Phase 2 Project |
Physical Address | View project details and contacts |
City, State (County) | Jacksonville, FL 32202 (Duval County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $63,719 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work consists of furnishing all labor, materials, and equipment and performing all operations necessary for the reconstruction of a through lane and changed to a right turn lane for the southbound direction on San Pablo Road at W.M.Davis Parkway intersection. This work is considered PHASE 2. The work includes raised concrete island removal, removal of existing striping, removal of existing pavement, and a new concrete island, added pavement repair, ADA accessible ramps, new pavement and lane striping, and signage in accordance with the Contract Drawings and Specifications. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |