Similar Projects
New Middle School #7
New Construction
Conception
Prosper, TX

High School #2 Construction
New Construction
Conception
Anna, TX

McDonald Junior High School Addition
Addition
Design
$20,876,963 est. value
Katy, TX 77449

Tafolla Middle School Project
New Construction
Design
San Antonio, TX 78207

Hays CISD - Chapa MS and Simon MS Additions
Renovation, Addition - 14,960 SF
Sub-Bidding
$3,800,000 est. value
Kyle, TX 78640

Ground Up Construction Projects
Post-Bid
Austin, Fort Worth, Houston, San Antonio, TX

Ground Up Construction Projects
Post-Bid
Austin, Fort Worth, Houston, San Antonio, TX

H.B. Zachry Middle School Magnet Addition/Renovation
Renovation, Addition
Results
$7,500,000 est. value
San Antonio, TX 78250

Frisco High School #12
Construction
Frisco, TX 75035

2019 Bleyl and Campbell Middle School Renovations
Renovation
Construction
Houston, TX 77064

Awty Student Center Phase 2
New Construction
Pending Verification
$14,000,000 est. value
Houston, TX 77055

Junior High School Conversion
Renovation
Conception
Cumby, TX 75433

High School Gym Construction
New Construction
Design
Mercedes, TX

Pete Abrigo AG Complex Remodeling and Improvements Project
Renovation
Post-Bid
$1,700,000 est. value
Weslaco, TX 78596

New Argyle Administration Building
New Construction
Construction
$4,890,554 est. value
Argyle, TX 76226

Last Updated 06/27/2022 09:45 AM
Project Title

Thomas Jefferson Middle School Renovations

Physical Address View project details and contacts
City, State (County) Port Arthur, TX 77642   (Jefferson County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,600,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Replacement of existing window wall systems 2. Abatement (if needed) in the Auditorium 3. Replacement HVAC system (Auditorium) 4. Addressing Accessibility issues in the Auditorium o (including stage and seating) 5. Installation of a new theatrical sound system 6. Installation of new ceiling in the Auditorium 7. Replacement of Building Automation System in the Athletic Area 8. Renovations in the Band Hall 9. If needed due to ADA requirements, renovations to the existing bathrooms Stadium (Estimated Cost of Construction- 3600000) 1. Construction of a new 8-lane track and the works (i.e., long jump pit, pole vault area, shot put (2), disc cages, etc.) 2. Demolition of facilities and bleachers which are in the way of the construction of the new 8-lane track 3. Building of new field house, locker/dressing room, restrooms, and concession stands to replace buildings which are to be demolished 4. Replace existing football field turf 5. Retrofit existing bleachers for handicap accessibility 6. Upgrade to the fire sprinkler system.

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents