Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

North System North Trunk (NSNT) Sewer Siphon Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Chino, CA 91710

Starbucks / San Bernardino
New Construction, Infrastructure - 1,001 SF
Bidding
$750,000 CJ est. value
Highland, CA 92346

Construction of Simulation Center
New Construction, Infrastructure - 70,000 SF
Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Replace Pcc and Ac Pavement With Jpcp and Hma Pavement
Infrastructure
Results
CA

Saw Cutting, Asphalt Repair/Replacement, Slurry, and Paving
Infrastructure
Results
Yucaipa, CA 92399

Starbucks - East Highland Avenue / San Bernardino
New Construction, Alteration - 928 SF
Pending Verification
$300,000 est. value
San Bernardino, CA 92404

Bartlett Public Parking Lot Lighting Upgrades - B.6 - City of Big Bear Lake
Infrastructure
Conception
Big Bear Lake, CA 92315

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

Runway 26R ILS Upgrade Project at Ontario Internatonal Airport
Infrastructure
Bidding
$3,250,000 CJ est. value
Ontario, CA 91761

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Last Updated 08/25/2022 04:36 PM
Project Title

Dupont Avenue Pavement Rehabilitation - City of Ontario

Physical Address View project details and contacts
City, State (County) Ontario, CA 91761   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $195,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of the pavement on Dupont Avenue from Greystone Drive to the end with an asphalt rubberized overlay. Construction of missing curb, gutter, access ramps, traffic signage, striping and related improvements as needed This project is included in the City of Ontario's FY 2022-2026 Capital Improvement Plan (CIP). As of August 25, 2022, information regarding a design team or a general contractor is not available. Construction is anticipated in FY 2023-2024 and is anticipated to be completed on June 30, 2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents