Reported | 03/09/2021 12:00 AM |
Project Title | 2021 Sidewalk Improvement Program |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI (Milwaukee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $75,000 |
Plans Available from | Municipal Agency - 02/15/21 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of the removal and replacement of concrete sidewalk, curb and gutter, driveway approaches, terrace area re-grading, and concrete and asphalt pavement replacement. Project includes all labor, equipment, materials and all work necessary in connection with the construction of: (All quantities are approximate) Section A 6,500 sf 5” Concrete Sidewalk Removal and Replacement 500 sf 7” Concrete Sidewalk Removal and Replacement 25 sy 7” Concrete Driveway Apron Removal and Replacement 200 lf 30” Concrete Curb and Gutter Removal and Replacement 50 sy Asphalt patching 200 sf Regrade Terrace Area Section B 125 sy 7” Concrete Street Panel Replacement 150 sy Asphalt Patching 125 lf Replace 30” Concrete Curb and Gutter |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |