Bastanchury Road Improvements from Casa Loma Avenue to Eureka Avenue (Interconnect from valley view avenue to lakeview Avenue)
Infrastructure
Bidding
$7,000,000 CJ est. value
Yorba Linda, CA 92886

Airfield Repairs
Infrastructure
Bidding
$450,000 CJ est. value
Los Alamitos, CA 90720

Tract 37509 Heirloom Street Improvements Temecula Center Dr Date Street and Ynez Road
Alteration
Post-Bid
Irvine, CA

Annual Concrete Replacement at Various Locations
Alteration
Post-Bid
$640,000 est. value
Orange, CA 92866

Omnibus Concrete Repairs
Alteration
Results
$450,000 est. value
Santa Ana, CA 92799

On-Call Asphalt Maintenance
Term Contract, Alteration
Results
Irvine, CA

Residential Slurry Seal
Infrastructure
Bidding
$1,200,000 CJ est. value
Mission Viejo, CA 92692

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

On-Call Aspalt Seal Coat Maintenance
Alteration
Results
Irvine, CA

Portland Ready Mix Concrete
Infrastructure
Bidding
$300,000 CJ est. value
Tustin, CA 92780

On-Call Concrete Sidewalk Surface Grinding
Term Contract
Post-Bid
Irvine, CA

Central Library Fountain Restoration Project
Renovation, Infrastructure
Results
Huntington Beach, CA 92648

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

LH on the Hill Letter Display
Alteration
Results
Laguna Hills, CA

Annual Local Paving Program
Term Contract
Post-Bid
Seal Beach, CA

Last Updated 09/20/2022 09:49 AM
Project Title

Second and Fifth Floor- Tenant Improvements

Physical Address View project details and contacts
City, State (County) Santa Ana, CA 92701   (Orange County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,930,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work includes selective demolition and installation of existing non-bearing interior partitions, electrical, finish ceiling, finishes, and plumbing fixtures. The Contractor shall be responsible for relocating and protecting any existing furniture to perform the work and for placing items back; items may be lifted in-place and/or moved to another area on the same floor. The Contractor shall be responsible for dust mitigation measures and daily clean-up, especially the protection of surrounding non construction areas, and protection of electronic devices from dust. Q&A Deadline 07/01/2022 2:00 PM (PDT) Bid Bond 10.00% Payment Bond 0.00% Performance Bond 0.00% Liquidated Damages $1,020 per calendar day Start/Delivery Date October to January 2023 Project Duration 120 Working Days License Requirements Class "B"- General Building Response Types Line Items General Forms (required) Ownership Affidavit (Notary Public) - REQ Original Hard Copy Submittal in Addition (required) Bid Bond Guaranty (Notary Public) - REQ Original Hard Copy Submittal in Addition (required) Non-Collusion Affidavit (Notary Public) - REQ Original Hard Copy Submittal in Addition (required) Type of Award Lump Sum

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents