Similar Projects
Accelerates Cleaning and Upgrades
Renovation
Bidding
Dania Beach, FL 33004

River Oaks Pump Station Project
New Construction
Bidding
$362,500 est. value
Fort Lauderdale, FL 33315

Utility Analysis Zone 108
New Construction, Infrastructure
Post-Bid
$21,504,000 est. value
Pompano Beach, FL 33060

Rehabilitation of Lift Station 22A, 21D, and New Force Main
Renovation, Infrastructure
Post-Bid
Coral Springs, FL

Wastewater Lift Station 25
New Construction
Results
Less than $412,000 est. value
Deerfield Beach, FL 33441

SW 130th Avenue Force Main and Lift Station 309 Improvements
Results
Davie, FL 33024

D/B - Design Build Flagler Village New Pumping Station A-24
New Construction
Post-Bid
$540,000 est. value
Fort Lauderdale, FL

Sewer Lift Station Rehabilitation and Repair
Term Contract
Results
FL

Lift Station Rehabilitation and Repair Services
Renovation
Post-Bid
Sunrise, FL

Replacement of Lift Station - 15
New Construction
Results
Pembroke Park, FL 33023

Sewage Lift Station Rehabilitation At Station Ft. Lauderdale
Renovation
Results
Dania Beach, Fort Lauderdale, FL 33004

Lift Station No. 3 Replacement Project
Renovation
Results
$790,000 est. value
Plantation, FL 33324

S9 and S9a Trash Rake and Pump Station Refurbishments
Renovation
Results
Fort Lauderdale, Southwest Ranches, FL 33317

Lift Station 14A Force Main Replacement
Renovation, Infrastructure
Results
Coral Springs, FL

Submersible Lift Station Pumps
Renovation, Term Contract
Results
Pompano Beach, FL 33069

Last Updated 07/17/2022 11:38 PM
Project Title

Sewer Lift Station Valve Vault Rehabilitation

Physical Address View project details and contacts
City, State (County) Weston, FL 33327   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Weston, Florida. Completed plans call for site work for a water / sewer project. The general scope of work includes but not limited to the following: a. Removal and disposal of vault valves and fittings. b. Furnish and install new vault valves, fittings. c. Surface preparation and epoxy painting of vault interior walls and floor.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents