Similar Projects
South Clark Street Bridge Over Blackhawk Creek - FP004 - City of Davenport
Infrastructure
Conception
$770,000 CJ est. value
Davenport, IA 52802

Eastern Avenue Bridge at Goose Creek - FP005 - City of Davenport
Infrastructure
Conception
$440,000 CJ est. value
Davenport, IA 52807

Duck Creek Bank Stabilization
Infrastructure
Bidding
$22,000 CJ est. value
Davenport, IA 52803

2023 Pedestrian Curb Ramp Retrofit Program
Infrastructure
Bidding
$300,000 CJ est. value
Davenport, IA 52801

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

Main Street Landing - Destination Play Area and Event Lawn
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Davenport, IA 52803

Wisconsin & 35th Street Improvements – HMA Surfacing And Trail
Infrastructure
Results
Le Claire, IA

CDBG Group 2 - Reconstruction East 7th Street (Iowa to LeClaire) and LeClaire Street (6th-8th)
Infrastructure
Results
Davenport, IA 52803

New Juvenile Detention Center - Scott County
Demolition, New Construction, Infrastructure
Pending Verification
$21,750,000 CJ est. value
Davenport, IA 52803

Middle Road Pedestrian Bridge - City of Bettendorf
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bettendorf, IA 52722

Adler Theatre Plaster/Paint Repair - FP085 - City of Davenport
Infrastructure
Conception
$975,000 CJ est. value
Davenport, IA 52801

PCC Patching
Infrastructure
Bidding
$750,000 CJ est. value
Davenport, IA 52806

Fairmount Community Center
New Construction, Infrastructure - 30,000 SF
Post-Bid
$2,200,000 CJ est. value
Davenport, IA 52804

31st and 32nd Street Speed Hump
Infrastructure
Results
Davenport, IA

Townplace Suites by Marriott
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Davenport, IA 52801

Last Updated 01/24/2023 04:40 AM
Project Title

Bridge Removal

Physical Address View project details and contacts
City, State (County) Davenport, IA 52806   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $23,298,854 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Id : 220621 S1 PN - IM-074-1(214)5--13-82, 10061 County: Scott Working Days : 200 IM-074-1(210)5--13-82 ROUTE: I-74 I-74 Mississippi River BridgesBetween Bettendorf, Ia and Moline, Il Estimated Value : $20,000,000 - $25,000,000 Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to Execute a Contract and File an Acceptable Performance Bond and Certificate of Insurance Within 30 Days of the Approval Date for Awarding the Contract Will Be Just and Sufficient Cause for the Denial of the Award and Forfeiture of the Proposal Guaranty. On Federal-aid Projects, Where Disadvantaged Business Enterprise (Dbe) Goals Have Been Established, the Bidder Is Required to Complete and Submit Form 102115 With the Bid Documents. On All Projects Without Dbe Goals, the Contractor Must Show That Affirmative Action Has Been Made to Seek Out and Consider Dbes as Potential Subcontractors. Minimum Wage Rates for All Federal-aid Projects Have Been Predetermined by the U.s. Secretary of Labor and Are Set Forth in the Specifications. However, This Does Not Apply to Projects Off the Federal-aid Highway System. All Federal-aid Projects Are Subject to the Contract Work Hours Standards Act, as Amended (Title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and Implementing Regulations. The Iowa Dot Reserves the Right to Waive Technicalities and Reject Any or All Bids. IADOT - 006 - Bridge Removal *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents