Similar Projects
OUC St Cloud Operations and Maintenance Facility
New Construction - 30,000 SF
Design
Orlando, FL 32800

Access Control Point Program Design Build II -- RFI(2)
Design

Operation and Maintenance of Government-Owned Facilities and Equipment, Jim Woodruff Lock & Dam and Lake Seminole Project, Florida and Georgia
Bidding

Operation and Maintenance of Government-Owned Facilities and Equipment, Jim Woodruff Lock & Dam and Lake Seminole Project, Florida and Georgia
Bidding

Town of Windermere Town Facilities
New Construction - 9,882 SF
Post-Bid
$5,200,000 est. value
Windermere, FL

Amendment 0003 - Design Build Contract for the General Construction Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple-Award Term Contract—with Design-Build Capabilities—for the State of Georgia
Post-Bid
$1,000,000 to $5,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Construct an Expansion for the McKay Bay Solid Waste Transfer Station
New Construction - 5,600 SF
Construction
Tampa, FL 33600

Construction Projects NVZR062031 and NVZR132003 MacDill AFB
- 33,500 SF
Construction
$5,000,000 to $10,000,000 est. value
Macdill AFB, FL

JetBlue Orlando Support Center Expansion
New Construction - 50,000 SF
Pending Verification
Orlando, FL

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Job Order Contracting Services
New Construction
Bidding
$3,000,000 est. value
Orlando, FL

Weatherization Contractors
Post-Bid

Engineering Department Pole Barn Replacement
Results
Augusta, GA

Reported 01/28/2020 12:00 AM
Project Title

General Construction to Support the 81st Regional Support Command throughout the South East

Physical Address View project details and contacts
City, State (County) State-Wide: FL, GA, KY, MS, NC, SC, TN
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The intention of this potential future solicitation will be to obtain Facility Investment Services (FIS). The General intent of Facility Investment Services (FIS) is for Sustainment, Restoration and Modernization (SRM) sub-functions. The SRM requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work. Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that is accomplished through other Army programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of sustainment. This can include but is not limited to: (1) Service Calls, both emergency, and routine: various locations; (2) Preventive Maintenance (PM) for a wide variety of equipment and systems: various locations; (3) Inspection, Testing, and Certification for various types of equipment: various locations; (4) Other Recurring Services for the inspection and repair of equipment and systems: various locations; (5) Repair, restoration, and modernization requirements which are beyond the scope of service calls, as well as related tasks such as preparation for and restoration from accidents and natural disasters. Task Orders issued under these contracts may be performed at any facility within the footprint of the specified region and is not only limited to the sites listed above.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents