Similar Projects
Premier Physical Therapy
Build-Out - 5,751 SF
Design
$500,000 est. value
Fort Worth, TX 76244

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Abilene Premier Eye Care
New Construction - 4,157 SF
Construction
$600,000 est. value
Abilene, TX 79605

Quest Diagnostics
Renovation - 1,700 SF
Construction
Plano, TX 75093

Texas Oncology Plano Alliance
Renovation - 6,126 SF
Pending Verification
$875,000 est. value
Plano, TX 75093

Austin Face and Body
Renovation - 4,965 SF
Post-Bid
Austin, TX 78746

CSL Plasma
Build-Out - 12,200 SF
Construction
Dallas, TX 75233

Design Build Services - JPS Medical Home
New Construction
Post-Bid
TX

Texas Health Family Care
Renovation - 3,247 SF
Construction
$290,000 est. value
Mansfield, TX 76063

Texas Health Resources Family Care Offices
Build-Out - 9,820 SF
Construction
$800,000 est. value
Fort Worth, TX 76135

Envision Radiology
Build-Out - 4,930 SF
Construction
Wylie, TX 75098

Momentum Specialty Surgery Center
New Construction - 22,150 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Wichita Falls, TX

Fresenius Kidney Care
Renovation
Construction
Fort Worth, TX 76140

Reported 02/08/2022 12:00 AM
Project Title

Y1da--Construction of New Community Living Center West Texas VA Healthcare System

Physical Address View project details and contacts
City, State (County) Big Spring, TX 79720   (Howard County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project will be to construct two (2) 10-bed cottages at 10,000 square feet each for the Community Living Center (CLC). These new cottages will replace CLC beds currently located on the 5th floor of the main building. This will be the second phase of construction for the new CLC, the first phase provided for two (2) 10-bed cottages and a Community Center. This project will include an estimated 10-15 parking spaces located near the cottages. The project will include site infrastructure improvements to electrical, sewer, and HVAC. This project will be designed to LEED Silver standards and includes decorative fencing, controlled access entries, and Wander-guard systems.

Details

Medical Office/Outpatient, New Construction, Medical Office/Outpatient, 10,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents