Similar Projects
Mississippi River and Tributaries Project (MR&T), Atchafalaya Basin Levee District (ABLD), MRL Armoring Near Morganza, Pointe Coupee Parish, Louisiana (ED 20-036)
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Baton Rouge, LA

White Oak Ditch Improvement
Infrastructure
Bidding
$975,000 est. value
Benton, LA

Landbridge Shoreline Stabilization and Marsh Creation Project
Infrastructure
Bidding
$13,231,110 est. value
New Orleans, LA

Luling Pe Office Flood Damage Repairs
Infrastructure
Post-Bid
$50,000 to $100,000 est. value
Luling, LA 70070

Cypress Island/Joe Daigre Drainage System Maintenance Project - Phase I
Infrastructure
Post-Bid
Saint Martinville, LA

LA 1 - Port Allen Canal Br Repl (PH1)(HBi)
Infrastructure
Results
$50,000,000 to $70,000,000 est. value
Shreveport, LA 71115

Airline at Clearview Intersection Improvements
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
New Orleans, LA 70119

Drainage Improvements to Lime Street
Infrastructure
Bidding
Gretna, LA

Biloxi Marsh Living Shoreline Project
Infrastructure
Post-Bid
$50,500,000 est. value
LA

LA 114 - X Drain Replace West of Hessmer
Infrastructure
Results
$250,000 to $500,000 est. value
Hessmer, LA 71341

Morganza to the Gulf Reach L Segment 1 Levee Project
Infrastructure
Bidding
Galliano, LA

Walter O. Bigby Carriageway Drainage Pump Station
Infrastructure
Post-Bid
$3,900,000 est. value
Bossier City, LA

LA 378 - Up Rr Crossing (Westlake)
Infrastructure
Results
$250,000 to $500,000 est. value
Westlake, LA 70669

Manson Ditch Drainage Improvements
Infrastructure
Bidding
Gretna, LA

Aluminum Pipe
Infrastructure
Post-Bid
Lake Charles, LA

Reported 07/22/2021 12:00 AM
Project Title

Bayou Chene Flood Protection Structure Phase 4B

Physical Address View project details and contacts
City, State (County) Morgan City, LA   (Saint Mary County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization/Demobilization, surveying, temporary erosion control measures, clearing, grubbing and stripping, levee embankment, drainage excavation, shoreline and scour protection, sheet pile installation, and turf establishment.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents