Similar Projects
SR 9/Marsh Road to 2nd Street Vic - Widening
Infrastructure
Design
$130,600,000 est. value
Mount Vernon, WA 98273

SR 534/Unnamed Tributary to Carpenter Creek - Fish Passage
Infrastructure
Design
$2,602,000 CJ est. value
Mount Vernon, WA 98274

Preschool Playground Remodel - Phase 1
Infrastructure
Bidding
$500,000 CJ est. value
La Conner, WA 98257

Sedro - Woolley Site Improvements
Infrastructure
Bidding
$559,100 CJ est. value
Sedro Woolley, WA 98284

32nd Street and M Avenue Intersection Improvements
Infrastructure
Post-Bid
Anacortes, WA 98221

Darrington Wood Innovation Center
Infrastructure
Post-Bid
$9,650,000 est. value
Darrington, WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

I-5 / Maddox Creek - Fish Passage
Infrastructure
Design
$15,457,000 CJ est. value
Mount Vernon, WA 98273

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

SR 20 Skagit River Fish Passage
Infrastructure
Results
$4,000,000 to $4,500,000 est. value
WA

RFQ D/B - SR 20/Olson Creek and Unnamed Tributary to Skagit River - Fish Passage
Infrastructure
Post-Bid
$20,000,000 CJ est. value
Concrete, WA 98237

WA NPS PP NOCA 2020(1) Pavement Preservation North Cascades
Infrastructure
Results
Sedro Woolley, WA

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Post-Bid
$210,000,000 CJ est. value
Kirkland, WA 98033

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Last Updated 10/13/2022 01:32 AM
Project Title

SR 530/Sauk River Roadway Embankment - Stabilization Top

Physical Address View project details and contacts
City, State (County) Concrete, WA 98237   (Skagit County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $5,055,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Flooding of the Sauk River has caused erosion of the river bank adjacent to SR 530. The roadway section from MP 58.90 to 58.96 (Section C) is determined to be an emerging threat. The recommended repair consists of placing logs along the toe of the bank and ballasting with large rock. As of July 27, 2022, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be completed in the second quarter of 2020. The contract advertisement is expected in Fourth quarter of 2022 and construction is anticipated to be operationally complete in the Forth quarter of 2023. WSDOT - SR 530/Sauk River Roadway Embankment - Stabilization Top *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents