Similar Projects
Downtown Infrastructure Project - City of Kingman
Infrastructure
Conception
$7,147,082 est. value
Kingman, AZ 86401

I-11 Kingman Crossing Traffic Interchange - City of Kingman
Infrastructure
Conception
$31,500,000 CJ est. value
Kingman, AZ 86401

(1-11 Project) Airway Avenue - Prospector Street to Rancho Parkway and (1-11 Project) Rancho Santa Fe Parkway TI Phase 1
Infrastructure
Design
$5,655,000 CJ est. value
Kingman, AZ 86401

US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 1 - Arizona Department of Transportation (AZDOT)
Infrastructure
Design
$70,000,000 CJ est. value
Kingman, AZ 86401

Installation of Roadway Lighting and Signage
Infrastructure
Bidding
$747,000 CJ est. value
Bullhead City, AZ 86442

Bridge Scour Retrofit & Bridge Rehabilitation
Infrastructure
Bidding
$2,000,000 CJ est. value
Kingman, AZ 86401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

Rotary Park Restroom
New Construction, Infrastructure
Results
$129,375 CJ est. value
Bullhead City, AZ 86442

Water System Well 4 and Waterline Improvements
Infrastructure
Results
Golden Valley, AZ 86413

16-2, 18-1 and 18-2 Lift Stations Wet Well Rehabilitations - 18-E-012 - City of Bullhead City
Infrastructure
Pending Verification
$630,000 CJ est. value
Bullhead City, AZ 86429

Nucor Melt Shop Facility
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Kingman, AZ 86401

Hilltop Plant Stairs Screens Replacement - City Of Kingman
Alteration
Conception
$500,000 est. value
Kingman, AZ 86401

Ramar Road Drainage Improvements - City of Bullhead City
Infrastructure
Design
$1,050,000 CJ est. value
Bullhead City, AZ 86442

Pavement Preservation
Infrastructure
Bidding
$4,500,000 CJ est. value
Bullhead City, AZ 86429

Last Updated 06/15/2023 03:35 PM
Project Title

Potable Water Line to 1519 Buck and DOE Road

Physical Address View project details and contacts
City, State (County) Peach Springs, AZ 86434   (Mohave County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated project value: $60,000 to $100,000 This contract will comprise work within the Buck and Doe Road (Indian Route 1) right-of-way including water lines, fire hydrant, bollards and appurtenances. Work within the property line of 1519 Buck and Doe Road is shown for illustrative purposes only and is not in the scope of this bid (see Bid Form). Prior to start of the work, the successful firm must possess a Tribal Permit, the permit will be obtained from the Game and Fish Department. All sub-contractors and service providers must also possess a Tribal Permit. The successful firm must also complete and submit a Compliance Plan under the Tribe's Tribal Employment Rights Office (TERO) to assure that qualified Tribal members are given opportunities to perform work as employees of the firm or team. The Contractor shall construct 700 feet of six inch (6") water main with appurtenances and 125 feet of one and one half inch (1.5") water service line with appurtenances as shown on the construction drawings with estimated quantities on the bid schedule. The accompanying Construction Drawings and Technical Specifications with appendices contains specific information about the scope of work. Written questions regarding this I F B must be received by the Public Services Department no later than April 27, 2023. Questions Shall be Directed To: Philip G. Wisely, P.E. Public Services Director (928) 769-2216 Philip.Wisely@Hualapai-nsn.gov Award of Contract (Estimated Date) : 05/07/23 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents