Similar Projects
10th Street Neighborhood
New Construction
Conception
Mountain Home, ID

North Star Outdoor Storage
New Construction - 217,808 SF
Conception
$500,000 est. value
Meridian, Star, ID 83669

North End Storage
New Construction
Design
Boise, ID 83702

Snow Removal Equipment (SRE) Building Coeur d'Alene Airport
New Construction - 8,272 SF
Bidding
$2,500,000 to $3,000,000 est. value
Hayden, ID 83835

WBWRF Maintenance Building - North Restroom Addition
Addition
Bidding
$300,000 est. value
Boise, ID

The Everest Lot 1
Addition - 58,000 SF
Post-Bid
Boise, ID 83716

Fedex Distribution Center
New Construction - 180,000 SF
Post-Bid
$10,000,000 est. value
Jerome, ID

Storage Building
New Construction
Results
Idaho Falls, ID

Mackay Hatchery Pole Building
New Construction - 1,536 SF
Results
$200,000 est. value
Mackay, ID 83251

Amazon Delivery Station
New Construction - 140,000 SF
Construction
$10,000,000 CJ est. value
Meridian, ID

Cemetery Project
New Construction
Post-Bid
$725,500 est. value
Blackfoot, ID 83221

Vehicle and Equipment Structures
New Construction - 11,800 SF
Results
$200,000 est. value
Caldwell, ID 83605

Saturn Way Storage Condos
New Construction - 1,495,284 SF
Post-Bid
$10,000,000 CJ est. value
Boise, ID 83709

Wittman Complex and MTB Renovations Phase 1 Lewis-Clark State College
New Construction, Demolition
Results
$295,000 est. value
Lewiston, ID 83501

Snow Removal Equipment (SRE) and Airport Office Building Coeur D`alene Airport
New Construction - 13,460 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
ID

Reported 06/16/2022 09:46 AM
Project Title

Public Storage - Ten Mile Road / Meridian

Physical Address View project details and contacts
City, State (County) Meridian, ID 83646   (Ada County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a warehouse / distribution facility in Meridian, Idaho. Conceptual plans call for the construction of a warehouse / distribution facility. The project appeared before the Planning Commission for the City of Meridian on June 2, 2022 and is under review. No other applications or building permits have been submitted. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set, however construction is not expected to begin prior to late 2022.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents