Similar Projects
Faulkner Lake Clarifier Launder Cover Project
Renovation
Post-Bid
North Little Rock, AR

Construction of the Proposed Wastewater Treatment Facility Improvements
Renovation
Bidding
Flippin, AR

Lost Bridge Village Treatment Facilities Improvements
New Construction
Post-Bid
$2,000,000 est. value
Garfield, AR

Wastewater System Improvements - Contract Section II (Wastewater Treatment Facility)
New Construction, Infrastructure
Post-Bid
Alpena, AR

Heber Springs Water and Sewer – WWTP Improvements
New Construction
Post-Bid
$7,000,000 est. value
Heber Springs, AR 72543

North WWTP Levee Rehabilation
Renovation
Results
Atkins, AR

Architectural Services
Infrastructure
Results
McCrory, AR

Fourche Creek Water Reclamation Facility Fog Receiving Station and Digester Upgrades
Renovation
Post-Bid
Little Rock, AR 72206

Wastewater System Improvements - Contract Section I (Collection System)
New Construction, Infrastructure
Post-Bid
Alpena, AR

Reported 09/15/2021 12:00 AM
Project Title

Wastewater Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Heber Springs, AR   (Cleburne County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Major requirements associated with this wastewater rehabilitation project are Mobilization, approximately 166 Ring/Lid Replacement Paved, approximately 336 Ring/Lid Replacement Non-Paved Approximately 238 Grout Lower 18 inches and Reconstruct Inverts, approximately 1471 Inches in Grade Adjustment, approximately 93 Chimney Seals and approximately 1,938 VF of Cementitious Coating and approximately 212 VF of Epoxy Coating.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents