Similar Projects
Traffic Calming Improvements
Renovation
Post-Bid
Less than $535,000 est. value
Fitchburg, WI 53575

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

Crack Routing and Sealing
Results
Madison, WI 53703

Road Work
Post-Bid
Verona, WI

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

Road Repairs
Post-Bid
WI 53572

Madison - Cambridge, Whitney Way to IH 39/90
Results
Cambridge, Madison, WI 53558

2021 Road Paving
Post-Bid
McFarland, WI

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

2021 Sealcoating
Renovation
Post-Bid
McFarland, WI

North Mendota Trail - West Segment Phase B
Results
Middleton, WI 53562

Chip Seal Surfacing and Crack Filling of Town Roads
Post-Bid
Roxbury, WI

Last Updated 11/12/2021 11:06 PM
Project Title

Black Earth - Sauk City, USH 14 to USH 12

Physical Address View project details and contacts
City, State (County) WI   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

5601-00-60, WISC 2022 006; STH 78; 7.840 Miles; Base, HMA Pavement, Beam Guard, Pavement Marking, and Culverts. Base Aggregate Dense, 3,380 Ton; Construction Staking, 41,530 LF; Construction Staking, 2 Each; Culvert Pipe, 68 LF 42”, 72 LF 30“; Beam Guard, 1,041 LF; Beam Guard Energy Absorbing Terminals, 13 Each; HMA Pavement, 19,020 Ton; Removing Asphaltic Surface Milling, 167,540 SY; Tack Coat, 11,780 Gals; Marking Line Grooved Wet Ref Epoxy 4-Inch, 80,650 LF.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents