Similar Projects
Snow Removal - Harrisonburg
Term Contract
Post-Bid
Harrisonburg, VA

Snow Removal - Harrisonburg
Term Contract
Post-Bid
Harrisonburg, VA

Solid Waste and Recycling System
Results
Waynesboro, VA

Collection Services
Results
Harrisonburg, VA

Snow Removal Services - Virginia Western Community College
Post-Bid
Roanoke, VA 24015

Solid Waste Collection and Disposal
Results
Gordonsville, VA

S--Non-Hazardous Waste Removal / Disposal and Miscellaneous Services at the Norfolk Naval Shipyard (NNSY), Portsmouth, VA
Post-Bid
Portsmouth, VA

Waste Removal, Disposal Services
Results
Culpeper, VA 22701

Snow Removal
Post-Bid

Refuse Removal and Recycling Services - National and Dulles Airports
Results
$1,000,000 to $2,500,000 est. value

Snow
Term Contract
Post-Bid

Snow Removal Services
Results
Warrenton, VA

Solid Waste Removal at Wytheville Community College
Term Contract
Post-Bid
Wytheville, VA

Airfield Rubber Removal and Airfield Painting
Results
Newport News, VA

Standing Timber
Post-Bid
VA

Reported 09/21/2019 12:00 AM
Project Title

Rob Vision Stewardship Timber Sale

Physical Address View project details and contacts
City, State (County) VA   (Wise County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Estimated volume of 298.20 CCF of combined hardwoods sawtimber, 764.90 CCF of mixed oak sawtimber, 8.80 CCF of yellow poplar sawtimber, 0.30 CCF of black cherry sawtimber, 36.60 CCF of softwood - other sawtimber, 1,124.30 CCF of Combined Hardwoods pulpwood, and 5.10 CCF of Softwood - Other pulpwood marked or otherwise designated for cutting. In addition, there is within the contract area two optional treatment units totaling an estimated volume of 101.38 CCF of combined hardwoods, 287.6 CCF of mixed oak, 2.94 CCF of yellow poplar sawtimber and 627.63 CCF of combined hardwood pulpwood. Also included in the contract are four (4) mandatory restorative service projects to be completed by the Contractor as well as six (6) optional restorative service project to be completed by the Contract if made mandatory by the Contracting Officer.
Details
Division 41 - Material Processing and Handling Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents