Similar Projects
I-285/I-20 West Interchange Project
Design
Atlanta, GA 31175

Panhandle Road Turn Lane Widening at Michelle Obama Academy
Alteration
Bidding
Hampton, GA 30228

David L Rainer Elementary School Storage Lanes
Infrastructure
Bidding
Kingsland, GA 31548

2018-2019 Local Maintenance And Improvement Grant Project
Post-Bid
Cusseta, GA 31805

Milling of Various Streets Annual Contract
Term Contract
Post-Bid
Jonesboro, GA 30236

2020 Full Depth Reclamation and Plant Mix Resurfacing
Results
Less than $5,809,929 est. value
Newnan, GA 30263

Tallokas Road Paving Improvements
Results
Less than $849,906 est. value
Moultrie, GA

Asphalt Leveling and Resurfacing Various County Road - LMIG
Infrastructure
Bidding
Dahlonega, GA 30533

3.588 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 1 Loop beginning at US 27/SR 1 And Extending North of SR 20 (Shorter Ave)
Post-Bid
GA

Indefinite Delivery Indefinite Quantity Paving - Fort Stewart/Hunter Army Air Field, GA
Results
$10,000,000 to $40,000,000 est. value
Fort Stewart, GA

0.378 Mile of Reconstruction on Sr 331 Beginning at Sr 85 and Extending to i-75/Sr 401
Infrastructure
Bidding
GA

Road and Drainage Improvements
Infrastructure
Post-Bid
Blackshear, GA 31516

Anvil Block Road, Phase III(Road Construction)
Results
Forest Park, GA 30297

Old Tram Road Improvements
Infrastructure
Bidding
Moultrie, GA 31768

Triple Surface Treatment Paving
Infrastructure
Post-Bid
Cleveland, GA 30528

Last Updated 01/11/2022 03:45 AM
Project Title

T32-D2-PavePres - A5 SR15/44 - 128433

Physical Address View project details and contacts
City, State (County) GA   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Perform prep work, removal, installation and cleanup for Pavement Preservation and Maintenance Services defined in this ITB. The majority of the work will occur on the Interstate and State Route system. The Contractor shall supply labor, equipment, tools, means of transportation, traffic control, and incidentals to perform work in accordance to specifications

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents