Similar Projects
Pigeon House SPS Rehabilitation
Renovation
Bidding
$500,000 to $1,000,000 est. value
Annapolis, MD

Septic To Sewer Conversion Project
Post-Bid
Glen Burnie, MD 21060

Septic To Sewer Conversion
Post-Bid
Millersville, MD

MH F and C Replacements Task Order (MH F&C TO - 2019)
Term Contract
Results
$1,000,000 to $1,500,000 est. value
Annapolis, MD 21401

Waterview Sewage Pump Station Retrofit
Results
$1,000,000 to $1,500,000 est. value
MD

Underground Utility Locating and Marking Services for Miss Utility Tickets at Various Locations Statewide
Post-Bid
$2,500,000 to $5,000,000 est. value

6" - 12" CIPP Lining - Baltimore
Results
$2,000,000 to $3,000,000 est. value
Annapolis, MD 21401

Repair Sewer Drain Line
Term Contract
Post-Bid
Less than $25,000 est. value
Annapolis, MD 21403

Freetown SPS FM ARV Replacement
Results
$1,500,000 to $2,000,000 est. value
MD

Ejector Pit Pumping and Sanitary Services at Baltimore Washington International Thurgood Marshall Airport
Term Contract
Results
$5,000,000 to $10,000,000 est. value
Glen Burnie, MD 21061

SPS Up/Retro - CC Estates
Results
$2,000,000 to $3,000,000 est. value
Annapolis, MD 21401

Marley Neck Fort Smallwood Gravity Sewer Replacement
Results
$2,500,000 to $3,000,000 est. value
MD

Marley Avenue SPS Upgrade
Results
$1,000,000 to $1,500,000 est. value
Annapolis, MD 21401

Glen Burnie Sewer Upsizing
Results
$1,000,000 to $2,000,000 est. value
Annapolis, MD

Vehicle Sally Port Sewer Line Repair at Patuxent Institution
Results
Less than $100,000 est. value
Jessup, MD 20794

Last Updated 08/18/2021 01:50 PM
Project Title

Chesapeake Harbor FM Replacement

Physical Address View project details and contacts
City, State (County) Annapolis, MD   (Anne Arundel County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,073,625
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The removal and replacement of approximately 4,255 lf of the existing 6- inch diameter CIP force main with HDPE, installation of one combination air/vacuum valve in vaults and temporary bypass piping.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents