Similar Projects
Water Well Pump Maintenance Services
Term Contract
Post-Bid
Lebanon, MO

Submersible Pump and Motor for the WWTP East Well
Infrastructure
Post-Bid
Lebanon, MO

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

Missouri Bluffs Park Well
Alteration
Post-Bid
Lake Saint Louis, MO 63367

Electrical Submersible Dewatering Pumps
Post-Bid
Saint Louis, MO

Neptune-Abaque Peristaltic Industrial Hose Pump Unit Model HDN25
Infrastructure
Post-Bid
Springfield, MO

Lime Slurry Pumps
Infrastructure
Post-Bid
Festus, MO

Design-Build Platform for Pump Disconnects
Infrastructure
Results
Saint Peters, MO

Fire Pump Replacement and Alarm Device Upgrade
Infrastructure
Bidding
Saint Joseph, MO

Plugging of Well 10, Well 11, and Voss Well
Infrastructure
Results
Sullivan, MO

Replacing Ras Pumps, Control Panels, Check Valves, Piping and Motors
Alteration
Bidding
Fulton, MO

JCHMF Phase 2 – Water Supply Well
Infrastructure
Results
Carthage, MO

Rehabilitate Relief Wells Phase 3
Infrastructure
Results
Kansas City, MO

1/2 Hp Cast Iron Pump
Term Contract
Post-Bid
Saint Louis, MO

Reported 07/23/2021 12:00 AM
Project Title

Well Maintenance Contract Services

Physical Address View project details and contacts
City, State (County) O Fallon, MO   (Saint Charles County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work includes providing scheduled well rehabilitation, preventative well maintenance, emergency repair contract services, alluvial well pump replacement and completion of a test well for the City.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents