Similar Projects
Opus Green
New Construction - 2,200 SF
Design
Millcreek, UT 84107

Lindsey Gardens Concession and Pedestrian Access 426 M Street
New Construction
Bidding
$1 to $415,000 est. value
Salt Lake City, UT 84103

Provide and Install Bleachers, West High School Fieldhouse
Renovation
Bidding
Salt Lake City, UT 84103

Sunnyvale Park Improvements
Post-Bid
$300,000 to $400,000 est. value
Millcreek, UT

Pickleball Court Construction Project
Post-Bid
Sandy, UT 84070

Herriman High Track Resurface
Results
$400,000 to $500,000 est. value
Herriman, UT 84096

Playground Pit Upgrade
Term Contract
Results
Less than $230,000 est. value
Herriman, Riverton, South Jordan, West Jordan, UT 84084

Bout Time Pub and Grub
New Construction, Renovation
Pending Verification
Sandy, UT 84070

Draper City Parks and Recreation Building Remodel
Post-Bid
$520,000 to $580,000 est. value
Draper, UT 84020

Basketball Court Resurfacing
Results
Riverton, UT

Gymnasium Bleachers Demolition and Replacement
Post-Bid
Taylorsville, UT 84123

Jordan and Liberty Park Flowers
Results
Salt Lake City, UT

Olympus High School Baseball Bleachers
Post-Bid
Holladay, UT 84124

Skate Park Design-Build Services
Results
Less than $370,000 est. value
Holladay, UT 84117

Construction Services for Pioneer Crossing Park - Phase I
New Construction
Post-Bid
Salt Lake City, UT

Last Updated 03/23/2022 11:32 AM
Project Title

Athletic Surfaces with Installation, Related Equipment, Materials, and Services Sourcewell

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Recreation and playground and swimming and spa equipment and supplies including maintenance and repairs. Roads and landscape material including asphalts and road and railroad construction materials and soil stabilizers and artificial turf and construction aggregates including rock, gravel, and sand

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents