Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ Design - Architect/Engineering Services for the Design of CDC/NIOSH Consolidated Cincinnati Research Facilities, Cincinnati, OH
Demolition, New Construction, Infrastructure - 235,000 SF
Design
$100,000,000 CJ est. value
Cincinnati, OH 45206

2020-2023 Seasonal Dock Installation and Removal
Infrastructure
Design
$100,000 CJ est. value
Sandusky, OH 44870

Precast Reinforced Concrete Box Culvert, Bardshar Road Culvert Ma-209
Infrastructure
Bidding
$55,000 CJ est. value
Perkins Township, OH 44870

Justice Center
New Construction, Infrastructure - 38,000 SF
Bidding
$13,177,301 CJ est. value
Sandusky, OH 44870

Liberty Avenue Water Main Replacement, Phase 2
Infrastructure
Post-Bid
Vermilion, OH

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Berlin Road Watermain Replacement
Results
$1,401,374 est. value
Huron, OH 44839

Liberty Avenue Water Main Replacement
Results
$648,730 est. value
Vermilion, OH 44089

Cedar Point ESports Arena
New Construction, Infrastructure
Pending Verification
$28,000,000 CJ est. value
Sandusky, OH 44870

Bridge Preservation - US 6
Infrastructure
Design
$3,040,000 CJ est. value
Sandusky, OH 44870

Perkins Avenue Waterline and Resurfacing Project
Infrastructure
Bidding
$4,393,049 CJ est. value
Sandusky, OH 44870

BIWW Vault Structure
Alteration
Results
$150,000 est. value
Sandusky, OH

Recovery Institute of Ohio Addition
Addition, Infrastructure - 5,794 SF
Design
$1,700,000 CJ est. value
Sandusky, OH 44870

2022 Pavement Marking Program
Infrastructure
Bidding
$75,000 CJ est. value
Vermilion, OH 44089

Last Updated 08/09/2022 02:34 PM
Project Title

Tiffin Avenue 12" Watermain Lining

Physical Address View project details and contacts
City, State (County) Sandusky, OH 44870   (Erie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $374,984 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All questions shall be directed to jcullen@ci.sandusky.oh.us in writing via email no later than 8:00am on Thursday, July 19, 2022. Bids will be opened and read publicly immediately thereafter in the Commission Chambers at City Hall, for furnishing the material and performing the labor for the execution of: Tiffin Avenue 12 Watermain Lining in accordance with the Plans and Specifications prepared by Director of Public Works, on file in its office, 240 Columbus Ave., Sandusky, OH 44870. ESTIMATE OF COST $370,000.00. There is no pre-bid meeting. Contact Megan Stookey at mstookey@ci.sandusky.oh.us or (419) 627-5878 to make shipping arrangements. Contract Documents may be reviewed without charge during normal business hours, 8:00am to 5:00pm in the Public Works office in its new location at 240 Columbus Ave and various plan rooms requesting documents. Prevailing Wage Rates and the City s Equal Opportunity Requirements are applicable to the Contract.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents