Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Neese Road Water Tower Drainage Improvements
Infrastructure
Post-Bid
Woodstock, GA 30188

Indian Avenue Culvert Replacement
Infrastructure
Post-Bid
Rossville, GA 30741

East Spring Meadow Drainage Improvement Project
Results
Acworth, GA 30101

Rope Mill Road Multi-Use Trail (Angela Court Extension )
Results
Woodstock, GA

Arnold Mill Road at Laurel Way Storm Drainage Repair
Infrastructure
Post-Bid
Canton, GA

Jefferson Drive Drainage Replacement
Results
Woodstock, GA 30188

Main Street Drainage Improvement
Results
Woodstock, GA 30188

T32-D6-Drain Rehab-Carroll-Haralson-117939
Results

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
Nelson, GA

Linton Street Drainage Improvements
Infrastructure
Results
$50,000 est. value
Woodstock, GA

Hub Transformation Project
Infrastructure
Results
Woodstock, GA

T32-D6-Drain Rehab-Dade-Floyd-Walker-126103
Infrastructure
Results

Dobbs Road Drainage Improvements
Infrastructure
Results
Woodstock, GA

Last Updated 03/10/2022 07:51 AM
Project Title

T32-D6-Drain Rehab-Cherokee-Haralson-Dade-Walker-1

Physical Address View project details and contacts
City, State (County) (Cherokee, Dade, Haralson, Walker Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Perform prep work, removal, installation and cleanup for Drainage Rehabilitation, Repair, Replacement, & Miscellaneous Maintenance Services defined in this ITB. The majority of the work will occur on the Interstate and State Route system. The Contractor shall supply labor, equipment, tools, means of transportation, traffic control, and incidentals to perform work in accordance to specifications

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents