Similar Projects
Court Street Improvements - EN-24-001 - City of Jacksonville
Infrastructure
Conception
$260,000 est. value
Jacksonville, NC 28540

Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

Asphalt Repair Project FY20
Post-Bid
Jacksonville, NC 28541

Rfb-Streets Division Asphalt Repair Project Fy21
Post-Bid
Jacksonville, NC

Carolina Forest Boulevard Resurfacing
Results
Jacksonville, NC 28546

Repair Pavement Building AS 4108
Results
$100,000 to $250,000 est. value
Camp Lejeune, NC

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Onslow Resurfacing and Pavement Preservation
Results
NC

2021 Utility Cut Asphalt Repairs
Infrastructure
Post-Bid
Jacksonville, NC

Sidewalk Routing and Sealing Project FY21
Results
Jacksonville, NC

Utility Cut Repairs FY22
Term Contract, Infrastructure
Post-Bid
$300,000 est. value
Jacksonville, NC

U-5735A US 17 and Douglass Rd Intersection
Results
Jacksonville, NC 28540

Paving Perimeter and Curtis Road
Term Contract
Post-Bid
$200,000 to $500,000 est. value
Camp Lejeune, NC

FY20 Street Rehabilitation Project
Results
Jacksonville, NC

2022 Street Rehabilitation
Infrastructure
Post-Bid
$300,000 est. value
Jacksonville, NC

Reported 07/14/2022 01:29 PM
Project Title

Country Club Villas Neighborhood Improvements - Cd-20-002 - City Of Jacksonville

Physical Address View project details and contacts
City, State (County) Jacksonville, NC 28540   (Onslow County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $513,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UPDATE: This project consists of neighborhood improvements throughout the Country Club Villas neighborhood. This project may include but is not limited to driveway improvements, street resurfacing, sidewalks, dumpster or corral placements and other needs as may be identified Project is included City of Jacksonville FY 2023-2032 CIP Page 38 ____________________________________________________________ This project consists of neighborhood improvements throughout the Country Club Villas neighborhood. This project may include but is not limited to driveway improvements, street resurfacing, sidewalks, dumpster or corral placements and other needs as may be identified. As August 13, 2021, this project is included in the City of Jacksonville's FY 2022-2031 CIP and funding is allotted for construction in 2022, 2023, 2024, and 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents