Similar Projects
Buckley Elementary School
New Construction
Conception
Manchester, CT 06045

Keeney Elementary School Construction
New Construction
Conception
Manchester, CT 06045

Medical Office
New Construction - 16,554 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Southington, CT

Gateway V Medical Office
New Construction - 90,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Glastonbury, CT 06033

Restroom Renovations of East Tower at Sedgwick Middle School
Renovation
Bidding
West Hartford, CT 06107

Hall High School Economic Studies Interior Renovations
Renovation
Bidding
West Hartford, CT

Bowers Elementary School
New Construction
Sub-Bidding
Manchester, CT 06045

Additions and Renovations to John F. Kennedy Middle School
Renovation, Addition - 162,000 SF
Post-Bid
$71,800,000 est. value
Enfield, CT 06082

Renovation of Bulkeley High School
Renovation
Post-Bid
$149,000,000 to $154,000,000 est. value
Hartford, CT 06106

Y1DA--689-402 Expand Primary Care - Construction (VA-19-00070477)
New Construction, Renovation, Addition - 37,771 SF
Results
$5,000,000 to $10,000,000 est. value
Newington, CT 06111

Owner's Project Representative
Renovation
Results
Newington, CT

Manchester Parkade Redevelopment
New Construction
Construction
$150,000,000 est. value
Manchester, CT 06040

Medical Office Building
New Construction - 16,200 SF
Construction
$2,400,000 est. value
Rocky Hill, CT 06067

Medical Office
Renovation - 2,000 SF
Pending Verification
Farmington, CT 06032

Norwalk High School
New Construction - 328,407 SF
Conception
Rocky Hill, CT 06067

Reported 01/28/2022 12:00 AM
Project Title

School Based Health Centers at Sunset Ridge and Woodland Schools

Physical Address View project details and contacts
City, State (County) East Hartford, CT 06108   (Hartford County)
Category(s) Education, Medical
Sub-Category(s) Elementary School, Medical Office/Outpatient, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Elementary School, New Construction, Middle/Senior High School, New Construction, Medical Office/Outpatient, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Countertops, Furnishings and Accessories, Furniture, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents