Similar Projects
Winery and Patio
New Construction, Infrastructure - 4,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rosemount, MN 55068

Como 154 Recycling - Retaining Wall and Sidewalk Replacement
Infrastructure
Design
$400,000 est. value
Minneapolis, MN 55414

OlyHi (Wooddale Station)
New Construction, Infrastructure
Design
Less than $83,500,000 est. value
Edina, MN 55416

2022 4th Avenue Bridge 27884 and I-35W Bridge 27878 Trail Improvements
Renovation, Infrastructure
Bidding
$400,000 est. value
Minneapolis, MN

2022 Clark Street Extension
Infrastructure
Bidding
$469,865 est. value
Saint Peter, MN 56082

Safe Routes to School
Post-Bid
Hawley, MN

Energy Hills, Woodland Ponds, Wintergreen Area Street Reconstruction
Post-Bid
Maple Grove, MN

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

CSAH 20 Angled Parking
Results
$523,491 est. value
MN

Large Motor Activity Space
Addition, Infrastructure - 4,000 SF
Construction
Willmar, MN 56201

Fairhill Estate at North Creek Addition
New Construction, Infrastructure
Pending Verification
Farmington, MN

School Trail Improvements
Infrastructure
Bidding
$400,000 est. value
Saint Charles, MN

Ryan Lake Industrial Park Area, Northwest Area & Lyndale Area Mill and Overlay Improvement
Post-Bid
$2,500,000 to $3,000,000 est. value
Brooklyn Center, MN

Parking and Pedestrian Safety Upgrades at AMRTC - General
Results
Less than $550,000 est. value
Anoka, MN 55303

South Junior High Site Reconfiguration
Post-Bid
$1,500,000 est. value
Saint Cloud, MN 56301

Last Updated 07/04/2022 08:36 AM
Project Title

23rd Street Trail Project

Physical Address View project details and contacts
City, State (County) Bemidji, MN 56601   (Beltrami County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Grubbing 0.54 acres; Remove Bituminous Pavement 395 SY; Excavation - Common (EV) 1,342 CY; Common Embankment (CV) 1,302 CY; Aggregate Base Class 5 1,560 Ton; Type SP 9.5 Bituminous 808 Ton; 4" Concrete Walk 63 SF; Misc. Concrete Curb & Gutter 200 LF; 6" Concrete Walk 1,556 SF; Truncated Domes 249 SF; Pedestrian Crosswalk Flasher System 2 Each; Turf Establishment 1.22 Acres; Crosswalk Multi-Comp Ground In (WR) 380 SF

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents