Similar Projects
Water Extension 32 Mile and Powell Roads
Infrastructure
Bidding
$2,000,000 est. value
Washington, MI

23 Mile Road Water Main Replacement
Infrastructure
Post-Bid
Macomb, MI

31 Mile Road Water Main Extension - Phase 1
Infrastructure
Post-Bid
$600,000 est. value
Washington Township, MI

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Florence and Ridgeway Water Main Replacement 2022
Infrastructure
Post-Bid
$700,000 est. value
Saint Clair Shores, MI

Water Pipe and Fittings and Hydrants
Term Contract
Results
Mount Clemens, MI

Gordon Road Reconstruction and Water Main Replacement
Infrastructure
Post-Bid
$500,000 est. value
Saint Clair Shores, MI 48081

Remick Drive Water Main Replacement
Results
Clinton Township, MI 48036

Water Service Installations and Repairs
Term Contract, Infrastructure
Post-Bid
Sterling Heights, MI

23 Mile Road Water Main
Results
Chesterfield, MI

2022-2023 Sewer and Water Repair Supplies and Water Meters Contract
Term Contract
Post-Bid
Saint Clair Shores, MI 48080

Maintenance of Irrigation and Park Restroom Water Systems
Results
Sterling Heights, MI

Check Valve Replacement
Results
Warren, MI 48089

2021 Water Main Replacement Project
Results
$3,325,000 est. value
Eastpointe, MI

Reported 05/25/2022 12:00 AM
Project Title

2022-2025 Commercial Water Meter Testing, Repair and Replacement Contract

Physical Address View project details and contacts
City, State (County) Saint Clair Shores, MI   (Macomb County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To periodically test commercial water meters to respond to customer requests or for other purposes. The City is looking for a contractor to test (as-needed) large meters based on size or other criteria. The City will provide the list of meters to be tested. All work will be completed at the direction of the City.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents