Similar Projects
Bethelboro Pump Station
Renovation
Bidding
$625,000 est. value
PA

Highland Reservoir Pump Station and Rising Main
New Construction
Bidding
$6,000,000 est. value
Pittsburgh, PA

Flowers Road Pump Station Construction General/Mechanical
Post-Bid
Derry, PA 15627

Jeannette Sewage Treatment Plant Pump Station Upgrade General / Mechanical Construction
Post-Bid
New Stanton, PA 15672

Long Term Control Plan Project 2018 Lift Station Improvements - General Construction
Results
Rochester, PA 15074

Pump Station No.1 Interceptor Sewer Lining and Manhole Repair Project
Results
$151,901 est. value
Carlisle, PA 17013

Sixth and Canal Pump Station Phase II Upgrade Project - Contract 1 - General Construction
Construction
$6,000,000 to $8,500,000 est. value
Reading, PA 19601

Maple Grove Sewage Pumping Station and Interceptor Expansion - General Construction
Construction
$1,400,000 est. value
Lancaster, PA 17603

Tanker Filling Station
Post-Bid
Renovo, PA

Southeast Pump Station - General Construction
Results
$350,000 to $500,000 est. value
Allenwood, Elimsport, PA 17810

Patch Pump Station Upgrades Project
Post-Bid
$120,000 est. value
Black Lick, PA

Furnishing 35 Grinder Pumps and 2 Spare Grinder Pump Cores
Results
Johnstown, PA 15904

Sanders Road Pumping Station Replacement Project
Post-Bid
Fairfield, PA 17320

Sheffield Terrace Booster Station Replacement
Results
Less than $895,850 est. value
Aliquippa, PA 15001

Pump Station 2 Grinder Project
Post-Bid
Gilbertsville, PA

Last Updated 04/25/2022 12:53 PM
Project Title

East Halls Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) University Park, PA   (Centre County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method
Project Status Construction Commenced second quarter 2021, Construction Complete as of first quarter 2022
Bids Due View project details and contacts
Estimated Value $1,980,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of the existing wastewater pumping station building, rehabilitation of the existing below grade wetwell, construction of a new above ground building including a new electrical room addition and replacement of all mechanical components.

Details

1 Lift and Pump Stations, Demolition, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents