Similar Projects
Last Updated | 06/29/2023 02:23 PM |
Project Title | RFQ- General Contractor Cliffwood Campground Toilet Shower Building Replacement |
Physical Address | View project details and contacts |
City, State (County) | Baraboo, WI 53913 (Sauk County) |
Category(s) | Entertainment/Recreation, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,264,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general the work consists of This project will demolish the existing Cliffwood Campground Toilet Shower Building (originally built in 1971) and replace it with a new toilet shower building at its current location. The new building will improve ADA access to the shower and toilet elements and improve the maintainability and functionality of the building. The project will also include water infrastructure, septic system upgrades, campsite electrical panel relocation, demolition of two vault toilets and construction of one new vault toilet, new host campsite with full hookup for water, sewer and power, site parking for six stalls plus two ADA stalls, and reconstruction of walking paths to improve ADA access to campground areas including access to the new toilet shower building. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Contract offer and construction phase records will be processed electronically on the WisBuild DFD Information System. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |