Similar Projects
WA NPS BP Olym 2019(2) Olym Bridge Preservation
Renovation
Design
$1,000,000 to $2,000,000 est. value
Port Angeles, WA 98362

WA NPS BP Olym 2019(2) Olym Bridge Preservation
Renovation
Design
$1,000,000 to $2,000,000 est. value
Port Angeles, WA 98362

SR 305, Murden Creek - Remove Fish Barrier
New Construction, Infrastructure
Bidding
$5,000,000 to $7,500,000 est. value
WA

OR Strategic Bridge Preservation 21-23 Bridge Deck Patching
New Construction, Infrastructure
Bidding
$1,000,000 to $1,250,000 est. value

Wooten Wildlife Area Watson Lake Foot Bridge Installation
New Construction
Post-Bid
$120,000 est. value
Olympia, WA

Bridge Painting Kiwanis Beach
Renovation, Infrastructure
Post-Bid
Republic, WA 99166

Improvement of Arch Bridge on Lamar Road
Renovation, Infrastructure
Results
$1,304,776 est. value
Prescott, WA 99348

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

US 101 / Hoquiam River Riverside Bridge - Machinery Room
Demolition, Infrastructure
Bidding
WA

Forest Road Bridges
New Construction
Post-Bid
Montesano, WA

Columbia County 2017 Bridge Rail (Turner and South Touchet Bridge Rail Update)
New Construction, Infrastructure
Results
$275,000 est. value
WA

US 195, Old BNRR Bridge to JCT SR 271 PCCP Rehabilitation
New Construction, Infrastructure
Bidding
$6,000,000 to $7,000,000 est. value
WA

Gene Coulon Memorial Park Trestle Bridge Replacement
New Construction
Post-Bid
$1,575,800 est. value
Olympia, Renton, WA 98057

West Seattle Corridor Bridges Rehabilitation and Strengthening Project - Construction Management Services
Infrastructure
Results
$5,000,000 est. value
Seattle, WA

I-90/I-5, E Sunset Way Vic and NB Lowell Rd Vic PCCP Exp Jnt Rehab and Deck Overlay
Renovation, Infrastructure
Bidding
Less than $1,250,000 est. value

Reported 02/26/2022 12:00 AM
Project Title

Auburn Station Pedestrian Bridge Stair Repair

Physical Address View project details and contacts
City, State (County) Auburn, WA 98001   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this Contract consists of replacing deteriorated stair treads in the western stair tower and garage with precast concrete tread and riser units. The project also includes replacing deteriorated metal deck and topping as well as applying a rust inhibiting paint on mildly deteriorated metal deck.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents