Similar Projects
2023 Gardiner Wastewater Improvements Project
Renovation, Infrastructure
Bidding
$700,000 CJ est. value
Gardiner, MT 59030

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

On-call Plumbing/Sewer and Drain Services
Term Contract
Post-Bid
Billings, MT 59103

Valves Upgrade
Term Contract
Results
$100,000 to $250,000 est. value
Fort Harrison, MT 59636

2023 Wastewater System Improvements
Renovation, Infrastructure
Results
$1,141,828 CJ est. value
Roy, MT 59471

Madison County Airport Public Water Supply Wells Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Ennis, MT 59729

Water System Improvements
New Construction, Infrastructure
Results
$1,058,316 CJ est. value
Havre, MT 59501

31A Canal Chute Rehabilitation Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Pablo, MT 59855

Lower Rattlesnake PRV and Water Main Replacement
Infrastructure
Results
$179,909 CJ est. value
Potomac, MT 59823

South 2nd Street West & Cottonwood Street Water Main Replacement
Infrastructure
Post-Bid
$694,311 CJ est. value
Missoula, MT 59801

East Central Ave and East Sussex Ave Water System Improvements
Infrastructure
Results
$1,389,693 CJ est. value
Missoula, MT 59802

TIFID Pump Station Filters
Term Contract
Post-Bid
Butte, MT 59701

2023 CIPP Projects
Infrastructure
Results
$611,935 CJ est. value
Bozeman, MT 59715

Roberts Carbon County Water and Sewer District
Infrastructure
Post-Bid
$400,000 CJ est. value
Roberts, MT 59070

Virginia City Water System Improvements
Renovation, Infrastructure
Results
$537,150 CJ est. value
Virginia City, MT 59729

Last Updated 03/12/2023 11:01 PM
Project Title

5th Avenue East North Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) Columbia Falls, MT 59912   (Flathead County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $253,350 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and Replacement of pipe, Asphalt Overlay, Rehab. and/or Maint., Fittings and Valves, Traffic Control, Grade and Surface, Fire Hydrant, Pavement Removal, Landscaping - Seeding, Waterlines The project consists of replacement of existing water main on 5th Avenue East North and includes the following major items: asphalt pavement removal, traffic control, abandonment of existing main, 8" PVC water main, water services, fire hydrant, fittings, asphalt surfacing, gravel surfacing, topsoil placement, and seeding. All Work, including vehicular traffic, shall immediately stop within a 50 ft. radius around the area of discovery. The Contractor shall ensure barriers are established to protect the area of discovery and notify the Engineer to contact the appropriate RD personnel. The Engineer shall engage a Secretary of the Interior (SOI) qualified professional archeologist to quickly assess the nature and scope of the discovery; implement interim measures to protect the discovery from looting and vandalism; and establish broader barriers if further historic and/or precontact properties, can reasonably be expected to occur.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents